FassaLIME
SUSTAINABILITY: OUR COMMITMENT
SUSTAINABLE BUILDINGBio-Architecture CO2
EMISSIONS FROM COMBUSTION REDUCED TO ZERO
REPLACEMENT OF FOSSIL FUELS
PLANTS IN COMPLIANCE WITH THE NEW EUROPEAN BENCHMARKS
Specifying render with sustainability in mind
Every specification tells a story. Not just about how a building should look, but also about the choices behind it: the materials selected, the performance expected, the processes supported and the long-term impact considered.
Where lime-based render fits
Rooted in tradition, lime-based render systems are valued for their breathability, vapour permeability and compatibility with older and moisture-sensitive building fabric. By helping moisture move through the building fabric, they support the protection of the wall beneath.
Evidence-based system specification
Developed for specifiers who want proven lime technology with modern support, Fassalime is Fassa Bortolo’s lime-based render system. Its credentials are reinforced at plant level, with strict emissions controls, lower fossil fuel use through wood waste fuel, and rainwater and wastewater recovery for production- related activities.
The choice ahead
For specifiers, the decision goes beyond the render system itself to the manufacturer behind it. Fassalime makes the specification decision straightforward by combining technical support with Fassa Bortolo’s commitment to environmental protection, workplace safety and responsible production.
TO FIND OUT MORE about Fassa Bortolo and its range of render systems and building products. Visit
www.fassabortolo.co.uk or call 01684 218 305
KD12
MEET JOHN BUCKLEY
‘As part of a team committed to excellence, I believe true success comes from delivering sustainable solutions, positive performance and exceptional service. We don’t just manufacture premium products, we’re building strong relationships with our clients and helping them to achieve the best possible results in a shared commitment to success.’ John Buckley,
National Housebuilder & Key Accounts Manager, Fassa Bortolo UK & Ireland
HQ1
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52