The crane is part of the process
Liſting is another area where factory production and site construction meet.
The module may have been engineered for a particular liſting arrangement, but the site team still has to execute that operation safely. Crane position, liſting radius, ground conditions, weather, access and sequencing all matter.
This is one reason why site installation should not be treated as an aſterthought to manufacturing. The connection between the module and the crane, and between the crane and the site, needs to be understood during design.
A component that is easy to manufacture is not necessarily easy to transport or install.
Planning for the road
The most effective MMC projects are likely to be those where logistics influences decisions before they become expensive. That can mean changing module dimensions, selecting a different manufacturing location, splitting a system into smaller components or altering the installation sequence. It can also mean choosing a site logistics strategy that avoids prolonged storage.
The point is not that every project needs the smallest possible module. Smaller units may increase the number of deliveries, connections and liſting operations. The correct
solution depends on the relationship between manufacturing efficiency, transport constraints and site requirements.
Factory location matters too
The location of a factory can have a major effect on the practical delivery model.
A manufacturing facility close to a cluster of projects may reduce transport distances and make repeat deliveries easier to manage. A highly specialised factory may offer better production capability but require components to travel much further.
That creates a commercial calculation as well as an environmental one. Transport is a cost, and long journeys introduce exposure to traffic, delays, weather, road restrictions and handling.
CITB’s 2026 research into workforce mobility also points to a broader change in construction: workers are becoming less willing to travel long distances for employment. The same wider geography matters for MMC supply chains. Factories, logistics providers and sites all depend on people and infrastructure being available in the right places.
The last mile is not the final problem
The phrase “last mile” makes logistics sound like the final step aſter all the important decisions have been made. In MMC, it is closer to the opposite.
Transport can influence module dimensions. Site access can influence design. Crane requirements can influence sequencing. Delivery schedules can influence factory production. Factory location can influence cost and programme. The strongest approach is therefore to treat logistics as part of DfMA from the beginning. That means designers, manufacturers, contractors and logistics specialists working together before a component is produced, rather than asking a transport company to solve the problem aſterwards.
MMC is oſten sold on the promise of moving complexity away from the construction site and into a controlled manufacturing environment. That is only partly true. Some complexity moves into the space between factory and site. The opportunity is to manage that complexity properly.
If the route, vehicle, liſting strategy, delivery sequence, inspection process and site installation are designed alongside the component itself, the journey becomes a controlled part of the manufacturing process rather than an unpredictable gap between two phases of construction.
For MMC to work at scale, the factory cannot simply make the building. It has to make something that can actually get to the building site.
Autumn 2026 M41 21
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44