search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PRODUCTS IN ACTION HVAC REFURBISHMENT


Upgrade at the health club


Bannatyne Health Club & Spa in Wellingborough, Northamptonshire, has been equipped with a TOSHIBA climate control solution supplied by Carrier Solutions UK, completing a full HVAC refurbishment designed to improve both customer comfort and operational efficiency. The eight-week project involved


HEAT PUMPS


Meeting the needs of Chester Zoo conference centre


Chester Zoo has installed a series of MITSUBISHI ELECTRIC heat pumps to provide heating and hot water to its Square event and conference facility. The venue combines a modern extension with the Grade II-listed stables block, built in 1886, and accommodates a variety of functions, including conferences, weddings and dinners for up to 200 guests. The installation includes two


Ecodan CAHV air-source heat pumps connected to a Climaveneta EW-HT water-to-water heat pump, which raises


the water temperature to 75°C for use in the radiators within the listed stables. Lower temperature water from the CAHV units, at 45°C, is used for underfloor heating in the modern part of the building. An additional Ecodan QAHV air source heat pump delivers water at up to 90°C for the kitchen and toilet areas.


Cooling in the conference spaces


is provided by three Mr Slim R32 air conditioning units, which use refrigerant with a lower global warming potential. The system is designed to meet the different heating requirements across historic and modern areas of the building while supporting the zoo’s broader sustainability and decarbonisation goals. ■


https://les.mitsubishielectric.co.uk


decommissioning and removing ageing R407c split systems that had reached the end of their service life and were increasingly costly to maintain. Ventec Services Ltd, the installation contractor, chose Toshiba products for their reliability, high efficiency and adaptable climate control capabilities. Equipment was sourced through Carrier’s preferred distributor, Cool Designs Ltd, ensuring a smooth and dependable supply chain. The installation included Toshiba


Variable Refrigerant Flow (VRF) systems, with SMMSu Heat Pump 2-pipe and SHRMe Heat Recovery 3-pipe models, as well as Digital Inverter R32 single, twin,


and triple split units. Outdated DX cooling coils and


condensing units in the club’s air handling systems were also replaced. Inverter- driven compressors adjust output according to real-time demand, reducing energy consumption, while the Toshiba Black Pear Central Controller allows temperature management across the gym, studios, spa and offices from a single point. Work was carefully scheduled to


minimise disruption to daily operations. ■ www.toshiba-aircon.co.uk


MULTI-UTILITY NETWORK LIGHTING UPGRADE


Standardised lighting rolled out across supermarket retail estate


Co-op food stores across England and Scotland are being upgraded with a standardised lighting programme delivered by ZUMTOBEL and Thorn. The programme covers a wide range of store sizes and formats, supporting Co-op’s ongoing refurbishment and expansion of its retail estate, with around 400 stores completed so far and further sites planned. The rollout applies a model store


approach designed to provide consistency while accommodating the constraints of individual locations, many of which are older or converted buildings. Zumtobel’s Tecton continuous row system forms the basis of the sales floor lighting, providing a repeatable framework that


28


can be adapted to different ceiling types, layouts and merchandising requirements. Design development and coordination are largely carried out remotely to support short delivery programmes and frequent site changes. Lighting to staff and back-of-house


areas, as well as external spaces such as façades, canopies and car parks, is provided using Thorn products. Emergency lighting is also standardised across the estate. The specification is based on LED lighting with dimming capability, with an emphasis on reducing energy use, simplifying maintenance and maintaining a consistent in-store


environment across the Co-op portfolio. ■ www.zumtobel.co.uk


Utilities networks and heat centre transferred to long-term operator


POWER ON has adopted the utilities networks and heat centre at Oval Village, a 1,374-home development overlooking the Oval cricket ground, following its role in delivering the site’s electric, water, gas and heat infrastructure. The company will operate and maintain these systems on a long-term basis. Oval Village is a brownfield regeneration project led by Berkeley Group and includes residential and commercial buildings. The development comprises seven


residential blocks with shared amenities and incorporates the restoration of a 145-year-old Grade II listed gasholder, now housing more than 200 apartments known as The Halo. Utilities provision was designed to accommodate both the scale and the heritage constraints of the site.


The heat network combines air


source and water source heat pumps in a four-pipe heating and cooling configuration. An air source heat pump located on Block B provides low-temperature water, which is then boosted by secondary heat pumps in a basement energy centre. Thermal storage vessels are included to improve operational flexibility, with gas boilers retained to meet peak winter demand. The system can provide both heating and cooling, reflecting the requirements of high-rise residential use. Power On also installed a high-


voltage electricity network, supplied from the Bankside primary station, and coordinated utilities delivery across the site, working with local authorities, heritage bodies and other


stakeholders. ■ www.poweron-uk.co.uk


EIBI | JANUARY 2026


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36