FOOD & BEVERAGE


CONDITION MONITORING KEEPS THE WATER FLOWING


H


ighland Spring Group is the largest producer of naturally sourced bottled water in the UK. They operate with highly critical assets throughout their manufacturing plants, including blow moulders, rinsers, fillers and labellers. If one of these assets goes down, production comes to a halt. Therefore, it is key that the health and condition of these assets is continuously monitored and maintained to the highest standard. To ensure the assets are running to their optimum and the site doesn’t suffer unexpected shutdowns, Highland Spring Group selected AVT Reliability® to assist them with their condition monitoring (CM) journey, with the goal of increasing plant reliability and protecting these critical assets. The project aims were to:


• Increase productivity • Extend machinery lifespan


• Optimise the periodic maintenance programme • Reduce machinery maintenance expenditures


PRODUCT SELECTION


AVT Reliability® have products and services to suit different scenarios. Following a site survey, AVT Reliability® engineers advised that the best suited CM technique to increase plant reliability was vibration analysis using Machine Sentry® Online. MOS-1 is ideal for vibration monitoring on continuously running, highly critical assets. The data being recorded is trended in real time, which allows remedial works to be carried out during a planned outage. Readings are automatically uploaded to the cloud-based platform, Machine Sentry®, and secured to ISO27001, one of the most widely recognised international standards for industrial supply chain security. As the platform is cloud based, engineers are able to analyse and report on data within minutes,


24 SEPTEMBER 2020 | FACTORY&HANDLINGSOLUTIONS


not days, wherever they are in the world. All asset health and analytics are completed in the system, meaning all data remains in one location.


MSO-1 IN ACTION


In January this year, the MSO-1 system at Highland Springs Group generated an email alert which identified increasing vibration levels on the outfeed start wheelbearing. This email alert allowed engineers to take action and investigate as soon as possible before the situation got out of hand. Following analysis from expert engineers at AVT Reliability® and discussion with the client, the conclusion was reached that the vibration increase was due to a possible bearing issue. Bearings had not been replaced since 2003. As the fault was found early, further damage to the asset was prevented. If the fault had gone undetected, there could have been catastrophic damage, resulting in a more expensive repair and extended plant downtime.


BENEFIT


MSO-1 allowed engineers to analyse the data collect and predict when a failure was going to happen. The engineers at Highland Spring Group were then able to plan scheduled downtime and complete the planned work scope within three days, saving 48 hours of repair time, amounting to a total of £16,800. When the cost of the Machine Sentry® system is removed, the actual saving is £10,300 after this one incident alone.


The table below shows the cost of maintenance for both the planned and unplanned scenarios for Highland Spring Group, for the bearing failure which was detected using Machine Sentry®.


Following the work completed by AVT Reliability®, David Simpson, site engineering manager at Highland Spring Group said: “To assist our goal


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52