AC upgrade targets Net Zero goal


Equipment and expertise from Fujitsu has helped to deliver a significant air conditioning upgrade for a major manufacturing facility in Derbyshire.


A


s part of plans to reduce the organisation’s operational emissions to Net Zero by 2030, the customer required a solution which


would replace fossil fuel energy sources, and at the same time increase cooling capacity, for a series of air handling units that serve a manufacturing cell. The system provides climate control to an area


where temperature critical manufacturing takes place, producing precision mechanical components. The machinery is cooled by process chilled water circuits. The existing AHU system heated the air passing through with a series of steam heat exchangers linked to natural gas boilers. The cooling element was provided by 160kW of DX, split over four stages of cooling, but with inefficient direct online compressors and operating on R407C refrigerant.


A perfect fit


With space at a premium, the compact footprint of Fujitsu’s equipment came into its own. A modular set-up of four V-III Heat pump VRF units (930mm w x


765mm d), each with 56kW cooling and 63kW heating capacity, was used for the first AHU. Three standalone J-IVS Heat Pump Mini VRF units (930mm x 370mm), each with 14kW heating and cooling capacity, were used for the second AHU. Refurbishment of the existing third party AHUs


resulted in four stages of cooling/heating for the first, with each stage designed to provide 50kW capacity in either mode. The second AHU has three stages of cooling/heating, with each stage providing 12kW. It is possible to have the AHU up to 165 metres away


from the condenser with 50m elevation for the V-III, while the J-IVS condenser can be up to 50m from the AHU with 30m elevation. In both instances, electronic expansion valves (EEV)


and EEV control kits provide control to each heat exchanger within the AHU. The kits, available to serve individual heat exchangers from 5-50kW, are capable of operating in heating mode with supply air of -7oC without supplementary heating. A touchscreen local controller is installed for each system for setup and future service visits. A BACnet


Built to order


The system was designed and delivered as part of a turn-key solution by Modern Project Services (UK) and the equipment supplied by CDL. Martin Seckington, director of Modern Project Services, said: “We were asked by the client to provide a system that could increase the cooling capacity of the existing air handling unit, but were limited on the space available to replace the existing chiller system. “The VRF condenser options available from Fujitsu


are so compact that it gave us more freedom from a design point of view and managed to meet the specification with relative ease. The installation has surpassed the client’s expectation and has resulted in an increased yield from within the facility, reduced downtime of the manufacturing processes and reduced consequential material waste. “The capacity modulation through BMS integration


and control has also expanded the operational cost savings on an already very efficient system.’’ Chris Beech, technical sales manager at CDL, said:


“The flexibility and ease of use that Fujitsu VRF offers when applying to DX allow us to find bespoke solutions for almost all project requests like this. A complete design service from Fujitsu provides all the necessary data in one document. This makes the transition from design to proposal a painless exercise.” Nick Wilks, national distribution sales manager at


Each VRF module serves two DX heat exchangers split over four stages of cooling and heating


Electronic expansion valves and EEV electronic control kits


Fujitsu General Air Conditioning UK, said: “We have seen a marked rise in the application of DX being used in AHUs, especially as people’s awareness in the importance of ventilation has increased. This has been a great project to show that DX can also be used to regulate conditions for industrial applications as well as climate control.’’


DOWNLOAD THE HVR APP NOW March 2022 11


Air conditioning


Fujitsu VRF


V-III compact condenser serving AHU1


Gateway connects the Fujitsu equipment to an existing building management system (BMS), which was reconfigured to accommodate the multi-stage cooling and heating of the new installation.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36