NEWS
Most read on .
.com
Carrier introduces new brand identity
https://www.acr-news.com/carrier-introduces- new-brand-identity
West Lothian College and Mitsubishi Electric team up with heat pumps
https://www.acr-news.com/west-lothian- college-and-mitsubishi-electric-team-up- with-heat-pumps
WorldSkills contestants get ready to face the judges
https://www.acr-news.com/worldskills- contestants-get-ready-to-face-the-judges
Conex Bänninger hits bullseye with anniversary darts challenge
https://www.acr-news.com/conex-banninger- hits-bullseye-with-anniversary-darts- challenge
Top contractors still optimistic despite economic ‘turmoil’
https://www.acr-news.com/top-contractors- still-optimistic-despite-economic-turmoil
A-Gas showcases at Installer Show 2025
https://www.acr-news.com/a-gas-showcases- at-installer-show-2025
Clivet launches air-to-water packaged heat pump EDGE PRO
https://www.acr-news.com/clivet-launches- air-to-water-packaged-heat-pump-edge-pro
ICS expands with new depot in Birmingham
https://www.acr-news.com/ics-expands-with- new-depot-in-birmingham
Refrec Reclaim makes light work of refrigerant recovery
https://www.acr-news.com/refrec-reclaim- makes-lightwork-of-refrigerant-recovery
Molle joins Conex Bänninger to drive sales growth
https://www.acr-news.com/molle-joins- conex-banninger-to-drive-sales-growth
Operational excellence in focus at CIBSE FM Conference
C
IBSE’s Measuring Performance and Facilities Management Conference recently brought together leading voices from across the built
environment to explore the evolving landscape of building performance and operational excellence. Held against the backdrop of increasing pressure
to improve lifelong building sustainability and effi ciency, the conference focused on cutting-edge themes including building management systems (BMS), data-driven decision-making, post-occupancy evaluation, and health and wellbeing metrics. The event also supported and expanded on the principles outlined in CIBSE Guide M: Maintenance Engineering and Management, reinforcing best practices in operational performance. The programme featured four dynamic sessions,
each off ering practical insights and discussion from experienced professionals across the sector. The fi rst session, Collaboration and Accountability in a Changing Landscape, was chaired by Vince Arnold, CIBSE President. This opening discussion explored how accountability and cross-disciplinary collaboration can unlock greater value in facilities management, with contributions from David Stevens, Robert Nicoll, and Tamsin Tweddell. In the second session, Balancing Performance with Building and Occupant Health, chaired by David Stevens, speakers, including Dr Philip Webb, Peter Brown, and Saurabh Bhandari, delved into strategies for harmonising performance optimisation with occupant well-being, emphasising the importance of creating effi cient, yet human-centric, spaces. The third session, Successful Collaboration and Lessons Learnt – Design vs. Maintenance, was chaired by Joanna Harris, UK&I Head of Technical Services at Sodexo. This panel refl ected on real- world projects where design decisions were infl uenced, or challenged, by long-term maintenance
considerations. Speakers included Bernard Crouch, James Campbell, Joanna Harris, and Sylvain Blanchard. The fi nal session, Post-occupancy Evaluation, was chaired by Volkan Doda, Head of Design Technologies at Atelier Ten. Featuring insights from Dr Victoria Tink, Ellen Salazar, Tom McNeil, and Volkan Doda, the session highlighted how POE can be used to close the feedback loop, validate design intent and identify opportunities for ongoing improvement in building performance. Refl ecting on the importance of the event, Dr Anastasia Mylona, CIBSE Technical Director, said: “As the sector looks to tackle both climate challenges and growing performance expectations, this conference provided a vital platform for knowledge exchange and collaboration. Sharing practical approaches and lessons learnt is central to improving outcomes and empowering the professionals who shape the buildings we live and work in.” The 2025 Measuring Performance and Facilities Management Conference provided delegates with valuable insights, real-world case studies and networking opportunities, reinforcing CIBSE’s role at the forefront of technical excellence and sustainable practice in the built environment.
6 July 2025 •
www.acr-news.com
Download the ACR News app today
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40