search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Installation News


TfL banks on Ellis patents’ cable hangers


Transport for London (TfL) has installed Ellis Patents’ innovative Pegasus cable hangers in its £500million Bank Station Capacity Upgrade project.


S


pecified through the North Yorkshire manufacturer’s UK distributor, ETS Cable Components, the hangers were chosen because their modular design meant they could be manufactured to the project’s very specific requirements.


Noman Shabir, Ellis Patents’ national sales manager, said: “TfL wanted hangers that could be supplied to meet a variety of radii because of the changing curvature of the operating tunnels running in and out of Bank Station. In addition, they needed a product that featured pre-drilled holes so that they could accept cable cleats for signal cables.” “Traditional cable hanging systems wouldn’t have coped with these requirements on the basis they


Product News Ovia introduces Inceptor Duo


Among the latest additions to Ovia’s growing premium lighting portfolio is Inceptor Duo - a sleek up and down dimmable linear luminaire.


I


nceptor Duo offers installers and their clients a complete custom dual lighting solution and is perfect for accentuating design features both high and low. It is available in two lengths – 1200mm and 1500mm – and two wattages – 42W and 56W. There are three colour options to cover all décor requirements – black, grey and white. The luminaire features a dual CTA switch - OFF, cool white, warm white and day light and the up and down lights can be controlled separately. Inceptor Duo is dimmable and emergency versions are available.


Watch the Inceptor Duo video here – https://youtu.be/iRUrgdhDOMo www.oviauk.com.


20 | electrical wholesaler October 2022 ewnews.co.uk


come in set sizes and configurations. Our thinking when we designed Pegasus was that no two rail projects are ever the same and as such project-by- project flexibility was vital.”


As with all of its products, Pegasus was designed and developed completely in-house by Ellis Patents. Featuring an aluminium spine that can support any number and configuration of polymer cable hangers, the modular cable hanging system is not only more adaptable than similar products, it’s also stronger and lighter; making it quick and easy to install. Ellis Patents manufactures Pegasus cable hangers using LUL approved materials, which are suitable for installation underground and within tunnels, as well as UV


stabilised materials for installations above ground and trackside.


The Bank Station Capacity Upgrade project was aimed at relieving heavy passenger congestion during peak hours and has seen the construction of a new southbound platform tunnel and associated length of running tunnel for the Northern line. It also incorporated the construction of connecting passageways to the existing station tunnels and the provision of step-free access from King William Street. It is due to be complete and fully operational in the Autumn.


www.ellispatents.co.uk 01944 758395


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52