Security & Monitoring


Mains power quality monitoring in a data centre


Data centres exist all over the world, not only as stand- alone operations but also in many other types of activity. These include banks, insurance companies, industrial companies, hospitals, airports, energy suppliers and administrations


T


he enormous energy requirements of these data centres confront both operators and energy suppliers with


major challenges.


Additional factors, which can randomly lead to problems and serious damage are becoming more and more the focus of attention. As shown in this use case the HuiShang bank in Hefei in the Anhui province in China decided to invest further in securing its 24/7 operations. To do this, they installed extra equipment to monitor the electrical power quality. As with any data centre operation, 24/7 availability is a fundamental requirement. Contracts have been signed with energy


suppliers and measures to introduce further redundancy have systematically been put in place in order to ensure an uninterrupted supply of energy. These include battery storage as well as generators and redundant supply lines into the data centre. However, as well as ensuring the supply of energy in sufficient quantity, the quality aspect has to be considered as well. This includes, depending on whether IEC standardisation is specified or not (for example according to IEC 61000-4-30, part 5.1 - 5.12, Class A) harmonic voltages, flicker, voltage dips and swells, transient voltages, rapid voltage changes (RVC), etc.


The energy for the data centre is distributed over more than 50 switchgear controlled circuits in the medium and low voltage domains.


These phenomena can cause lasting damage to servers and the infrastructure (for example uncontrolled machine shutdowns, generation of system defects, etc.) and it is essential to detect them early. To allow these phenomena to be detected in a timely manner, the power quality needs to be continuously analysed due to the fact that mains power supplies behave dynamically as a result of the constantly changing consumption and power feed-in situation caused by non-linear consumers (for example LED lighting, frequency- controlled air conditioning systems, the switching power supplies of the servers, etc.) and decentralised energy sources (for example if there are PV systems on the roof of the data centre, etc.). The management of HuiShang Bank


An AM3000 series SINEAX from Camille Bauer is installed in each control cabinet to monitor the power quality. From here, parameters such as waveform and voltage events are monitored and any deviations are reported immediately.


36 March 2019 Components in Electronics


quickly realised that along with data security and energy availability, it is essential to take the power quality parameters into account as well. To do this, a network quality analyser was installed in the control cabinet of each of the 52 bases currently installed the medium and low voltage domains.


The criteria for choosing to deploy SINEAX AM3000 were the price/performance ratio and the availability of the required measurement data. A further evident advantage was that setting the parameters of the power quality analysers was simple and user-friendly and could be integrated in the overall system via WebGUI. Furthermore, via Modbus TCP/IP, all data and information can be visualised in the WebGUI interface without using any additional software. This obviously means considerable savings in extra effort and costs.


"Thanks to continuous monitoring of the waveform and the power quality events, the engineers of HuiShang bank were able to directly increase system stability while explicitly lowering the risk of failure of the equipment used", states the responsible project manager Ms Hu, in a clear summary of the objective.


www.camillebauer.com www.cieonline.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52