Interlinking for Canister Transport with a Bridge W


hen a customer came to mk saying that they needed to achieve continuous transport without


complicated stopping and turning for their production line, mk said no problem! Two machining stations in a plastic canister production


process needed to be interlinked and the solution had to cope with inconvenient spatial constraints: Empty canisters needed to be conveyed along a curve and past another machine so that they could be brought back to the original feed height at the discharge point, where they were allowed to accumulate. The canisters were transported standing and transverse to the conveying direction, and they needed to have the same alignment at the end of the





interlink that they had when they entered. Each canister weighs about two kilogrammes. The interlink needed to run reliably in a two-shift operation. Additional spatial constraints regarding the length and height of the interlink had to also be observed. mk devised a transport system built from the mk modular


construction kit. A KMF-P 2040 curved modular belt conveyor was used to feed the products in. This allowed the canisters to be transported in the correct position without complicated stopping and turning. Two ZRF-P 2040 timing belt conveyors with a timing belt equipped with longitudinal grooves serve as the incline. They were positioned at an upward incline of about 30°. The canisters travel between the two lines. The


   


high friction of the timing belt and gentle clamping between the lines ensure that the canisters are transported upwards. A closed-loop controller is used to precisely synchronise the two timing belt conveyor lines so that there is no offset. A GUF-P 2000 belt conveyor serves as the bridge, while two additional timing belt conveyors transport the canisters downwards again. An additional belt conveyor with an end stop is used as the discharge and removal station. The entire frame is built using the mk profile construction kit.


mk Profile Systems  01949 823751  www.mkprofiles.co.uk





automationmagazine.co.uk


Automation | March 2019 33


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72