PC-DEC21-PG10.1_Layout 1 04/01/2022 09:21 Page 10


FLOW & LEVEL CONTROL PROJECT PARTNER FOR PHARMA APPLICATIONS Crucial to the design phase is the


integration of valve and instrumentation models, into the piping and instrumentation diagram (P&ID) in order to create a full 3D model of the plant. This requires 3D CAD STEP files of all components that the designer can import into their plant model. A project partner like Bürkert will make these models available for simple and free access, downloadable from a website or provided directly. Useful input to design plans can also include a virtual fluidic simulator model that demonstrates a proof of concept. Implementing the design requires careful


Damien Moran, Bürkert’s field segment manager for the hygienic & pharmaceutical sector, discusses the benefits of the


combined project management approach


has to specify, procure, commission and support automation, valve and instrumentation component packages, as well as systems that span a variety of expertise. This ranges from automation, including control panels and pneumatic valve islands, to electrical and instrumentation, such as flow meters, sensors and electro- pneumatically actuated valves, to mechanical components, including manually operated valves. The end user might specify from an authorised supplier list, and the system integrator may suggest preferred brands. However, the design consultant has the responsibility to select fluid control components that integrate effectively, not only to ensure an optimised process but also to maximise efficiency of commissioning and reliability of operation in the field. From fieldbus communications to


A certification approvals, the design consultant


pharmaceutical manufacturing system project, typically managed by an engineering design consultant, often


needs to handle the challenges associated with the integration of diverse brands for the automation, electrical and mechanical areas of a pharma project. Alternatively, the design consultant can work with a valve and instrumentation partner that assures effective integration of components across all areas. Such a partner can also provide project management and support from start to finish, including ongoing field support. This starts with a design consultation and is


potentially the area of greatest benefit to the overall effectiveness of a project as it provides the opportunity to check and optimise the system design using input from specialists in hygienic fluid control solutions. In Bürkert’s case, typical examples of providing design consultation and designing customised solutions include combining individual valves into a single, multi-port block valve solution to reduce the overall footprint, maintenance requirements and costs. System performance can be improved by minimising areas of dead volume with a manipulated drainable design alternative. In terms of automation, design advice can be provided on concepts such as centralised and decentralised control through to integration of digital communication protocols and the information/ diagnostics which can be communicated.


10 DECEMBER 2021/JANUARY 2022 | PROCESS & CONTROL


and effective project management based on technical competence as well as commitment in support throughout. Bürkert’s model includes a local account manager plus the support of a dedicated pharmaceutical sector specialist, with direct access to a central Hygienic Competence team that coordinates global expertise. Many projects are international, based for example around a UK design consultant with various OEM’s and Contractors from around the world. These are supported by Bürkert’s international network of pharmaceutical project managers that enable easy communication for global projects and installations. A key to design and project management


includes ensuring that all required documentation, including certificates and approvals, is available. Due to the critical nature of approvals for the pharmaceutical sector, it’s vital that a project partner has the knowledge and experience to advise on the requirements of individual products, as well as if and how those approvals are met. During project installation, physical space is


typically at a premium. Scheduled delivery of components staggered to match the project timeline is therefore important. While working with several individual suppliers can make this more of a challenge, a single project partner can efficiently manage this process. While the engineering consultant tends to


rely on an installer, technical support in set up may also be required, usually for electrical or automated aspects, such as a valve island or control valve commissioning. Providing this assurance alongside the handover of the project to the end user, as well as offering additional field support, is not only of practical value but also provides peace of mind. To optimise hygienic pharmaceutical fluid


control system design and implementation, the optimal approach is holistic project management. Delivering the successful integration of mechanical, electrical and automation packages is essential, and the support of a pharmaceutical specialist project partner throughout a project will ensure a more efficient process delivery as well as an optimised outcome for the end user.


Bürkert Fluid Control Systems www.burkert.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66