Poorly considered pipework design can lead to unnecessary energy losses in heating and cooling, undermine water conservation strategies, and increase operational costs. With system efficiency so important, the conventional approach of over-specifying pipework to cover all bases no longer cuts it – bespoke systems are critical.
This goes beyond pipework dimensions and the number of fittings and returns. Materials are under greater scrutiny than ever before too, with the embodied carbon of systems now a crucial factor in any specification choice. Reusing old specifications that rely on outdated material choices, can often mean lower-carbon alternatives are overlooked.
The case for tailored solutions
So, what does a more effective approach look like? At its heart, it is about taking the time to consider the specifics of each job. Rather than defaulting to the familiar, project teams
Sustainability as a driving force
There are sustainability considerations too. Nobody needs to be told that sustainability is much more than a box ticking exercise in the current landscape, particularly in new build projects. Everybody involved in the development chain faces increasing pressure to demonstrate not only compliance, but also leadership in sustainability. As a result, the transition towards net zero and
circular economy principles is reshaping every aspect of construction. System efficiency is paramount and pipework systems (so crucial to the building services they house) can play an important role in achieving project goals.
should seek to understand the challenges and opportunities, the materials available to them and of course the latest regulations. Only then can they design their pipework system accordingly. At Pipe Centre and Climate Centre, our team works closely with customers to undertake pipe sizing calculations in accordance with CIBSE, BS EN guidelines, and manufacturers’ technical datasheets. This is just one part of an effective system design, but it is a critical step towards system efficiency and optimisation.
By tailoring system design to each individual job, contractors and their clients alike will unlock the benefits of systems that are not only compliant, but also optimised for performance, sustainability and cost-effectiveness. The construction industry has a real opportunity to evolve together, moving beyond old habits towards more dynamic, tailored approaches. By doing so, we can deliver pipework systems that not only meet the needs of today but also help shape a more sustainable, resilient future.
EVOMAX 2 10YEAR
The best got even better, now available with a market-leading warranty from the UK’s commercial brand you can trust.
WARRANTY SCAN ME *
GET A BOILER QUOTE TODAY
idealcommercialheating.com
Read the latest at:
www.bsee.co.uk Ideal hp BSEE
Nov25.indd 1
*10-year parts and labour warranty is subject to Terms and Conditions available at
idealcommercialheating.com. Evomax 2 boilers must be installed on an Ideal pipework header kit with plate heat exchanger and commissioned by Ideal Heating and also requires an additional Enhanced Appliance and Primary System Check which is chargeable at £250 per boiler. This does not affect the 5-year warranty proposition which is still available with free commissioning.
9/9/25 14:26 BUILDING SERVICES & ENVIRONMENTAL ENGINEER NOVEMBER 2025 19
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46