This page contains a Flash digital edition of a book.
Advertising: 01622 699116 Editorial: 01354 461430


BOILERS & HOT WATER BSEE Maximising boiler performance


aking measures to reduce energy consumption in buildings makes perfect commercial and environmental sense. Historically, the focus has been on improving the energy performance of new builds but it’s the energy-inefficient existing buildings that pose the real challenge.


T


With many UK buildings relying on old or inefficient commercial boiler plant for heating and hot water, the potential for energy and cost savings is huge. So why do some boiler replacements fail to deliver the anticipated results? Chris Meir, Sales Director at Remeha, looks at how to avoid an energy performance gap from condensing boilers.


Some 60% of UK non-domestic buildings (and 80% of homes) in 2050 are likely to have been built before 2010, according to BRE. So addressing their energy efficiency – and ensuring that we achieve the full potential savings from cost-effective energy saving improvements – is critical. Around 40% of the UK’s energy is used for heating and hot water, according to the Committee on Climate Change so it’s a good starting place for improvement measures. With commercial boilers providing heating and hot water in many UK buildings, it’s essential that the system operates efficiently to avoid waste and high energy bills.


Replacing old or inefficient boilers with high efficiency condensing boilers is a quick win for improved energy performance. Many buildings may still be relying on old or inefficient non- condensing boilers that will be 70% efficient at best. With new condensing boilers capable of achieving high gross efficiencies of up to 97%, it doesn’t take a genius to do the maths. The European Union predicts that buildings stand to benefit from 20% savings where older equipment is replaced with more energy-efficient technology. Through the Ecodesign of Energy-related Products Directive (ErP), it has imposed tighter energy efficiency and NOx emissions requirements for space heating up to 400kW. This, in turn, has effectively created a drive from non-condensing to condensing boilers to comply with the more stringent performance standards.


But given the huge capacity for energy and emissions savings from a boiler upgrade, why, then, do we hear of some condensing boilers failing to deliver the predicted gas savings? And what steps can we take to zensure that the potential financial and environmental benefits are achieved?


Condensing boilers are able to recover both the sensible and latent


heat in flue gases – which is otherwise lost in conventional boilers. As a result, they are around 10-12% more efficient than non-condensing boilers. However, for full condensing to occur, the return temperature needs to be below dew point, which is normally around 54°C. In older buildings, the radiator circuits will typically have been sized on 82°C flow and 71°C return temperatures which prevents the condensing boilers from fully condensing.


Most radiator circuits in existing buildings can be rebalanced to achieve lower return temperatures as radiators are often oversized, especially where fabric improvements have been made since the original boiler installation. By lowering the flow and return temperatures to 70/50°C or even 60/40°C, the condensing boilers will have the opportunity to condense and achieve their higher efficiencies without affecting comfort. Resizing the current heat demand of the building is essential. Avoid replacing ‘like with like’ as the load may have changed since the last assessment due to changes in use or occupants. Over- or under-sizing the boilers will result in poor energy performance and potentially an uncomfortable building environment. Condensing boilers perform more efficiently at part load, so choosing to share the load across multiple units rather than selecting one large output boiler will deliver higher energy savings. Installing the boilers in a cascade arrangement also increases the turndown ratio and improves the boilers’ modulation capability. As a result, they can match more closely the heat demand of the building. An added advantage of a multiple- boiler design is that it is easier to maintain and service, meaning greater lifetime savings. The in-built redundancy of the design makes the boilers easier to service, maintain and replace, reducing labour and downtime.


Control, control, control


Allocating a budget for controls is key to achieving higher heating efficiencies. Good control supports good design, ensuring high performance from the boilers. Our recommendation is to include time, temperature, sequencing and modulating controls as standard.


Adding weather compensated controls to the heating circuits will help the boilers adapt to the fluctuating demand according to the outside temperature while keeping the return temperatures as low as possible. This will maximise efficiencies.


With multiple boiler cascade systems, including a sequencing control in the design will increase the lifecycle of the products by rotating the lead boiler to achieve equal use of each individual unit. Care should be taken to fully integrate controls into the Building Management System to maintain optimum boiler performance. Commissioning is the final, crucial step, so it’s important to allocate sufficient time and budget in the overall design concept. Hydraulic, combustion and controls commissioning is essential to ensure that the heating system performs and delivers as designed.


Upgrading any old and inefficient boilers to high efficiency, ultra-low NOx condensing boilers like Remeha’s Quinta Range could transform the energy performance of the UK’s inefficient buildings. This is a cost- effective, flexible, tried-and-trusted technology that is capable of reducing energy consumption, cutting emissions and lowering bills.


www.remeha.co.uk


 


uEnergy savings – The ICE is anticipating energy savings of 30 to 50% since upgrading to high­ efficiency Remeha Gas 310 and 610 Eco Pro condensing boilers.


‘


Many buildings


may still be relying on old or inefficient non­condensing boilers that will be 70% efficient at best. With new condensing boilers capable of achieving high gross efficiencies of up to 97%, it doesn’t take a genius to do the maths.


’ 9 


9  


9  


9 


9  


9  


  


VISIT OUR WEBSITE: www.bsee.co.uk


COMMERCIAL & INDUSTRIAL


BUILDING SERVICES & ENVIRONMENTAL ENGINEER NOVEMBER 2017 17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56