search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
FOCUS: DOMESTIC HEATING & VENTILATION


Hot water cylinders are a hidden lifeline for energy storage


A


s energy security continues to be a cause for concern for the UK, an industry report has identified the potential role of hot water cylinders in balancing


demand on the electrical grid. The report from the Hot Water Association


(HWA), entitled Connected Homes, explores the potential for hot water cylinders to be used as thermal stores for grid electricity to build resilience in peak periods. If the nine million cylinders in UK homes


were connected through smart controls and used as batteries, the National Grid could unlock 23GWh of energy storage – around half the energy used per day in the UK. Due to the introduction of technologies, like heat pumps, which require hot water cylinders, this number could increase by 36%, increasing the energy capacity to 40GWh. To make use of this energy storage potential, cylinders will need smart functionalities introduced either via retrofitting smart controls or brand-new smart cylinders will need to be installed with gas boilers or heat pumps.


Heating engineers will be key in the


process of making this a reality, as Kevin Lowe, technical manager at the HWA, said: “Hot water cylinders’ potential role in the energy mix is substantial and there is work to be done to make the most of this


opportunity. Installers across the UK installing and maintaining cylinders in homes can play a crucial part in this, as our report highlights, by making existing and new cylinders connected.” The report from the HWA also highlights the need for policy direction to incentivise the rollout of connected thermal storage in UK homes for homeowners. This is particularly needed to prevent people from changing their hot water system to remove the cylinder completely so the number of cylinders in the UK can increase to build capacity.


In addition to incentives to drive more people to install smart cylinders and retrofit controls to existing cylinders, the report lays out next steps for improving uptake. This includes making smart controls and cylinders more beneficial to SAP and EPC ratings in new builds and reducing taxes and levies on off peak electricity to bring more value out of storing energy in a cylinder.


Kevin continues: “The key to making this


project a reality will be getting homeowners on side, so policy direction must incentivise adopting smart hot water storage. “Whether installing a cylinder with a new heat pump installation, or fitting controls to an existing one, homeowners may require financial support to make it worth their while. They will also need to understand the benefits that thermal storage in their home


may provide and in turn prevent them removing an existing hot water cylinder. “If we are to get the up to 40GWh of energy storage that our research predicts


could be achievable in the UK, industry, Government and installers must work together to help homeowners understand these benefits.”


Load balancing for real-time energy consumption


EM511:


Single phase energy analyser with Modbus RTU or M-bus


• Voltage input: 1-phase, 120 to 240 V L-N • Current input: direct connection up to 45 A • Initial quick setup wizard ensures error free setup • Modbus RTU or M-Bus communication port • 100 ms serial data refresh time • Optional digital output for pulse or alarm output • UCS configuration software (Modbus RTU) • UKCA, CE, cULus approvals


Carlo Gavazzi UK Ltd. - 4.4 Frimley Business Park, Frimley, Camberley, Surrey GU16 7SG - Tel: 01276 854 110 - www.gavazziautomation.com Carlo Gavazzi hp BSEE Nov23.indd 1


Read the latest at: www.bsee.co.uk


13/10/23 11:19 BUILDING SERVICES & ENVIRONMENTAL ENGINEER JANUARY 2024 21


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38