HUMIDIFICATION & DEHUMIDIFICATION
museum and data storage facilities that we provide equipment to.
Humidity control & wallpaper
Another interesting application was a digital print room for a wallpaper producer. Due to all the heat gains produced by the press, the print room was falling to an alarmingly low humidity, causing the machine to register that it was out of tolerance and as such out of guarantee.
On this occasion, the Vapac electrode boiler provided the answer as it is the perfect workhorse for general humidity control – low capital cost and easy to operate. This British manufactured machine (the only steam humidifier manufactured in the UK) provides humidity consistently above 50%rh to reduce static and ensure that the digital press is within its A1 zone to produce the best possible quality product.
Hopefully, this all demonstrates the vast variety and unique requirements of many humidity control applications. Our responsibility is to be able to provide specialist advice and recommend the best equipment for each project.
WHY CHOOSE US -+-
DECADES OF EXPERIENCE IN HUMIDITY CONTROL
SPECIALISTS
HUMIDITY CONTROL MADE EASY
-+- “Humidity Solutions has very quick lead times, with most of their
products being in stock items and the reliability of their products is fantastic. The staff are always incredibly helpful, knowledgeable and eager to please with a very ‘can do’ attitude. ”
CONTACT OUR EXPERTS E:
info@humiditysolutions.co.uk W:
humiditysolutions.co.uk T: +44 (0)1372 571 200
The Humidity Solutions team provides comprehensive support for your humidity control projects. From design and supply to installation, commissioning, servicing, and planned maintenance, we offer bespoke solutions tailored to your specific needs. Whether you’re facing a complex challenge or simply need expert guidance, we have the knowledge to help. Contact us today to learn more about how we can help make humidity control easy.
Humidity Solutions hp BSEE
Jan24.indd 1 Read the latest at:
www.bsee.co.uk
11/12/23 20:23 BUILDING SERVICES & ENVIRONMENTAL ENGINEER JANUARY 2024 15
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38