Cases & enclosures
ENCLOSURES PROVIDE PLUG-AND-PLAY ELECTRICAL INSTALLATION FOR CONSTRUCTION PROJECTS
With the pressures of modern construction projects, many contractors need electrical installation solutions that combine speed, safety and value. Spelsberg’s recently launched range of TKS enclosures meets these requirements, featuring pre-assembled components and pluggable systems tailored to each customer. Consequently, users can expect simple, efficient and fault-free installations.
W 64
hat sets the TKS range apart from other designs is that its plugs, distribution components and cables are planned
in advance and incorporated in the enclosure. Pre-assembled cables and standardised plug
connectors ensure true plug-and-play functionality, dramatically shortening installation times compared to traditional wiring systems.
FAST AND SAFE INSTALLS This is especially beneficial in structures that have repetitive room layouts such as offices, hotels, hospitals, schools, daycare centres,
care homes, exhibition halls, industrial sites and shopping centres. Furthermore, thanks to the plug-and-play design, the TKS system is easily expandable, allowing changes or redesigns to be implemented on the fly. Electrical systems can be simply installed while wider construction is ongoing.
Suitable for fitment in suspended ceilings, wall ducts, cavity walls and raised floors, the TKS can be used to support lighting, smoke detectors, speakers, balcony door contacts and more. By using the TKS, contractors can accelerate the installation of key electrical services, meeting tight project schedules and budgets.
Safety is also at the heart of the TKS range. Installation errors are virtually impossible with the standardised plugs and factory pre-assembled components, which stop incorrect connections for a fault-free installation. Unused plugs are simply blocked off to prevent mistakes by operatives. This also means that less-specialised personnel can carry out installations safely.
April 2025 Instrumentation Monthly
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80