• • • ELECTRICAL EQUIPMENT• • •
WHY COMMISSIONING STARTS LONG BEFORE INSTALLATION
BY GRACE BALL,
PROJECTS SUPERVISOR UK&I, DESOUTTER TOOLS AND PHIL COLEMAN,
BUSINESS DEVELOPMENT MANAGER, ADI LEAN MANUFACTURING & DESIGN
anufacturers are under pressure to increase throughput, minimise downtime and integrate increasingly sophisticated electrical equipment into existing operations, while ensuring systems can be brought online quickly following installation or upgrades.
M
As equipment becomes more complex, successful commissioning increasingly depends on the quality of the work carried out during project scoping, stakeholder coordination, system design and manufacture, rather than activities carried out during final testing on site. “Customers aren’t just looking for a system that works,” explains Coleman. “They’re looking for a solution that can be integrated, commissioned and brought into production with minimal disruption, supporting smoother ramp-up. For us, this means successful commissioning starts well before equipment reaches the site.”
Laying the groundwork Modern electrical systems can combine control panels, drives, motors, protection devices, sensors
and control hardware from multiple suppliers, creating interfaces that must be correctly specified, assembled and validated from the initial RFQ and system design stages through to Factory Acceptance Testing (FAT). Preparation is, therefore, one of the most important factors in commissioning success. Component selection, validation, FAT, collaborative planning and early integration testing help to identify problems before equipment reaches site, while practical factors such as site readiness, available utilities and competing contractors can also influence commissioning timelines. Errors introduced during manufacture may only become apparent during FAT or site commissioning, where identifying and correcting them is considerably more disruptive than preventing them during assembly.
Removing risk Software and controls are often a focus of commissioning discussions as electrical equipment becomes more connected, but the physical design, quality of the build and assembly processes remain equally important. Even the most advanced control architecture cannot compensate for inconsistent assembly processes or avoidable variation introduced during manufacture. “You can have the best software in the world, but if the machine has been badly designed or poorly built, those issues will still appear during commissioning,” says Coleman. “The objective is to remove as much uncertainty as possible before the system reaches site.” Commissioning performance can, therefore, be influenced by decisions made much earlier on the
26 ELECTRICAL ENGINEERING • OCTOBER 2026
factory floor. Consistent assembly, verification of critical operations and records showing that work has been completed correctly can all reduce the number of unknowns remaining when equipment reaches site. Instead of discovering whether equipment has been manufactured as intended during commissioning, engineers can concentrate on confirming its performance within the wider installation.
This approach surfaces risks earlier in design, assembly and validation, giving manufacturers greater confidence before equipment progresses through FAT and reaches site.
Improving consistency As electrical equipment becomes more complex, manufacturers are increasingly looking for technologies that help control process variability, improve traceability and ensure critical assembly operations are completed as intended. The focus is moving beyond productivity alone, with manufacturers seeking greater repeatability, process adherence and digital records of critical operations.
“Many manufacturers are operating with increasingly unskilled and flexible workforces while also introducing more complex products and production processes,” says Ball. “In this environment, relying solely on tribal knowledge becomes an impossible approach. Digital process control helps ensure critical information is embedded within the process itself.” Technologies such as Desoutter’s Pivotware process control system help manufacturers embed quality checks into assembly workflows. By guiding operators through the correct sequence and providing visibility into completed
electricalengineeringmagazine.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40