• • • SURGE & CIRCUIT PROTECTION • • •
Stopping sparks flying
Imagine you had to go to the breaker box and turn off your entire home’s electricity supply every time you need to plug or unplug something. Now take that inconvenience and scale it up a thousand times. Imagine a vast factory that may have to disconnect equipment thousands of times a day, possibly in explosive or hazardous atmospheres, and the problem becomes clear. Here Nick Lewis, product manager at cable and connector and cable specialist PEI-Genesis, discusses hot disconnecting in industry
T
he UK has the best plugs in the world, at least as far as science, technology, history and linguistics YouTuber Tom Scott is concerned.
Once you go through the arguments it’s difficult to disagree, with British plugs including fuses, a built- in ground terminal and yank protection, which is found almost nowhere else in the world. One particularly innovative part of the design is
that the ground terminal is five millimetres longer than the live and neutral terminals. The ground makes contact first, which provides an escape route for any excess charge as the live and neutral contacts mate a moment later. The practical upshot of this is that British plugs are far less likely to arc when connected or disconnected. Connecting and disconnecting powered
connections like this is known as hot disconnecting in industry and, while avoiding arcing is beneficial for safety in the home, in industry the risks are far higher.
ONLY DISCONNECT
The first question is — why hot disconnect at all? If equipment is powered down before disconnecting, all the associated problems can be avoided. For small industrial applications this is acceptable, but as factories expand this solution becomes
impractical. Powering down equipment can lead to major losses in production and can be a very time consuming and labour-intensive process to plan and implement. Many industries work this way, and the only real
consequence is a reduction in the connector’s cycle lifetimes as the arcs slam into the contacts over and over. This arcing can lower cycle ratings by over 500 times, so it’s certainly a factor to keep in mind, but the increased cost of replacing connectors 500 times more frequently are massively outweighed by the increased production generated by keeping equipment powered up. Another contributing factor is that industrial
voltages are often many times larger than the 230 volts of home circuits. The possibility of arcing is a direct function of the voltage and the distance between the contacts, so a larger voltage makes for stronger and longer arcs. Because the contacts start off touching, some
arcing is unavoidable at the point they un-mate. This is limited in connectors which include a longer grounding terminal, just like the standard British plug, but arcing will always occur to some degree.
ONLY CONNECT However, there are some industrial situations
28 ELECTRICAL ENGINEERING • NOVEMBER 2020
where even minor arcing poses danger, most notably explosive environments. The threat of catastrophic explosive
consequences for arcing in these environments means that ATEX certified hot-disconnect connectors require an additional design consideration. These connectors, like the Trolex Falcon25, use a two-stage connecting process. First the enclosure mates, and then the live
contacts. This creates an explosion-containing capsule, meaning that if there is an explosive atmosphere present to be ignited by the arc, any explosion is safely contained within the capsule and therefore doesn’t have the opportunity to spread. Hot disconnecting equipment is something that
almost every industry does, but how many plant managers keep the connectors in mind when they do so? A hot disconnect in your home probably feels natural and doesn’t have any negative consequences if you are using an ultra-safe British plug. But, in a factory, it will reduce connector lifespan. However, sacrificing connectors for productivity is a sensible trade off, just one you should understand before you make.
PEI GENESIS 02380 621 309
peigenesis.com
electricalengineeringmagazine.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52