SUP
• • • •
SUPPORTING Y CRITICAL POWER
TIONWIDE POWER PROI
Having a well maintained UPS is critical to sustaining its performance, which is why we have decided to include free maintenance for the first year on all new Borri UPS systems. This includes
s:
Same day response to emergency calls logged before 10am Freephone emergency callout number 24 hour UPS technical support All travel an
All travel and labour costs for reactive maintenance nd labour costs for reactive main ntenance
Same day response to emergency calls logged before 0am1 eephone emergency callout number 4 hour UPS technical support
aving a well maintained UPS is critical to susta ining its performance, which is why we have decided to include free maintenance for the first year on all new Borri UPS systems. This includes:
CRITICAL POWER NAT
PPORTING YOUR AT ONWIDE POWER PR TOTECTION 24/7TECTION 24/7
R
F M
FREE
MAINTENANCE WITH ALL NEW
UPS SYSTEMS WITH ALLNEW
UPS SYSTEMS
Power Control td, RL
ower Control Ltd, Rotherside Road, Eckington, Sheffield, S21 4HL E:
info@powercontrol.c
info@powercontrol.co.uk
otherside Road, Eckington, Sheffield, S21 4HL
co.uk
T T:: +44(0)800 136 993 )800 136 993
www.powercontrol.co.uk.powerco
ontrol.co.uk
FROM1 3 PHASE UPS SY
3 PHASE UPS SYSTEMS FROM 10kVA0kVA - 6.4MVA
YSTEMS A - 6.4MVA
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64