EV Infrastructure


Shield Selects Sync Energy As It Switches To Electric


When specialist technical contractor, Shield committed to transforming its


knowing that the van fleet was also planned -


fleet of company cars to electrical – and it decided to


install a comprehensive EV charging facility at its new head office in Bristol. Working with Sync Energy, part of the Luceco Group, the company opted for Sync Energy Pro Charger Twin Wall Mounted EV Chargers as being the best commercial EV charging solution for the increasing volume of use.


As Edward Vill, Electrical Operations Manager, Shield Mechanical Electrical & Facilities Services explained, “We already had single chargers but the ongoing move to electric, combined with increasing demand from visitors to the site meant that when we moved to new premises, a better and bigger solution was not only needed but with Sync Energy it was possible and practical.”


Twin Charger, WC2’s And Load Balancer


With twin Type 2 socket outlets, a backlit intuitive colour touchscreen, and built in 4G connectivity, MCB and MID metres as standard, the


Sync Energy


supports Monta QR code, RFID, Plug and Charge, and if required.


Payment Terminal


The Pro Charger range features Twin Bollard EV Chargers, available with or without amenity lighting option, and Twin Wall-mounted


Chargers. Both the wall-


mounted and bollard options come with PEN fault detection, touchscreen, RFID, 4G connectivity, and an MID meter as standard. This comprehensive suite of features ensures that our chargers are not only user-friendly but also future proof, catering to a wide array of commercial applications.


Pro Charger Charging,


The unique Balancer enables link up to 16 charge points dynamically to the building supply, ensuring no overload of circuits, protecting assets with a Stainless-Steel Crash barrier. The Sync EV Balancer is designed to ensure that the electricity supply is not exceeded by EV Charging.


When it comes to EV chargers, there is no allowance for diversity, so a 32A charger needs to always use 32A. When 2,3,4 chargers are added this soon adds up, which is where the Sync EV balancer comes in. The balancer is a hardwired system for reliability and requires no subscription, its scalable for up to 16 charge points (16 duals gives you 32 charging bays), and it dynamically manages the available building power, distributing it evenly between the connected vehicles. Available in both single-phase up to 120A and three-phase up to 400A.


Edward continued, “Over and above the technical spec, we also


liked the sleek look


of the system and its user-friendly nature. We currently have key fobs open to all.”


Sarah Cox, Sync Energy’s Business


Development Manager described the project. “Sync Energy’s service covers all the bases. We started with a site visit, assessment of needs, calculations on loading, before quoting and supplying with the help of Sync Energy distributor, Medlocks of Bristol. Sync Energy then supported both the install and commissioning. It was a real pleasure collaborating with Shield Electrical on its exciting new site. Together, we delivered sleek, user-friendly wall chargers that made it simple for them to power up their electric vehicles. It’s great to see sustainability in action, and I’m looking forward to continuing


our support for Shield as well as enabling more forward-thinking projects like this in the future.”


For more information, visit https://sync.energy/commercial fmuk 19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48