Transmission & distribtution |


Curtailment of wind power has cost UK households a total of £1.5bn since 2021, according to Carbon Tracker’s data. However, with project TraDER, ElectronConnect helped curtailed wind farms trade with local flexible demand assets at times of excess renewable energy generation. The local demand-side resources got paid to use the renewable energy, and the generators avoided curtailment. To achieve this, a market was developed at the local level, where curtailed wind turbines could pay local demand-side resources to turn up their demand to soak up excess generation. Behind that market, Electron helped develop processes that put the FSPs at the heart of the project.


With 24k micro-trades totalling 8.3 MWh during the project, trading was automated and demand assets were dispatched via APIs (application programming interfaces). The FSP participation therefore required minimal human intervention – which significantly increased participation. Near real-time responses to price signals were layered into the market design, to again boost asset participation.


Trades were informed by curtailment signals sent to curtailable wind farms from the network’s active network management (ANM) system in real-time (see Figure 1).


These innovations allowed TraDER to deliver a new type of distribution-level market through ElectronConnect, which: operated in real time;


allowed DERs to trade directly with one another – to increase their revenue streams and ensure more low-carbon energy is used; and gave visibility at the local level for demand turn-up requirements – all through one market platform.


This project was a precursor to a second stage, which is currently underway: project BiTraDER, a market for curtailment obligations trading.


Project BiTraDER


While TraDER tested a very specific use case – demand turn up in response to generation curtailment and in one specific network location


Figure 2. Project BiTraDER – trading local curtailment obligations


– BiTraDER allows all four activities (demand turn up and turn down, generation turn up and turn down) to be offered into the market, depending on the constraint type. It can also cover multiple locations, or even the whole DSO network, and is technology-agnostic. These factors increase the volume of flexibility that can be procured. Most importantly, in the ongoing BiTraDER project, information flows in both directions – from the ANM to the trading platform and back to the ANM. The project will therefore create a blueprint for scaling and integrating third- party market platforms with network operating systems, to increase the use of flexibility markets and facilitate those bilateral data flows. To test this blueprint, an asset-to-asset – or many-to-many – market for local curtailment obligations trading will be established (see Figure 2). In this market, the system operator will produce and share with the trading platform a list of predicted constraints up to 48 hours ahead and the DER curtailment queue – the “merit order stack”.


The DERs that are predicted to be curtailed can pay another DER to take their place in the curtailment queue, through ElectronConnect’s flexibility marketplaces. Flexibility sellers – the non-curtailable assets – set the price at which they agree to be curtailed in the event of a constraint. Flexibility buyers – or the curtailable assets – set the maximum price they are willing to pay to buy their way out of a constraint. The system operator, while acting neutrally in this market, benefits from the market as it makes curtailable connections more attractive and allows them to connect more DERs onto parts of the grid with high levels of constraints, faster.


This once again delivers on the industry’s need for more clean, low-carbon energy with access to more data insights – and value – for buyers, sellers, and managers of flexibility.


This is possible with new integrations between ElectronConnect, Electricity North West’s network management systems, and other services to enable two-way data flows (see Figure 3). Those data flows enable a level of interoperability that’s critical as the ecosystem for flexibility continues to evolve.


Managing network constraints


Figure 3. Project BiTraDER – two-way data flows 26 | March 2024| www.modernpowersystems.com


These projects exemplify the importance of flexibility market platforms, such as ElectronConnect, in helping meet national decarbonisation targets and resolving industry-level operational challenges in managing the constraints on the network – and in procuring flexibility in the most efficient and cost- effective manner.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47