Table 2: Routine licensing correspondence between the US NRC staff and Duke Energy Progress during the application
Date 02/5/2025 04/1/2025 04/8/2025 04/21/2025 04/25/2025 ADAMS Accession No. ML25045A006 ML25091A290 ML25077A315
ML25099A005 (90 FRN 16707)
ML25113A162 Subject NRC. Robinson Unit 2, Subsequent
Licence Renewal Application Public Meeting Summary of Pre-Submittal Meeting
Duke. H.B. Robinson Steam Electric Plant, Unit 2, Appli-cation for Subsequent Renewed Operating Licences
NRC. Robinson SLRA – Receipt and Availability – Letter.
NRC. Robinson SLRA – Receipt and Availability – FRN.
NRC. H.B. Robinson Steam Electric Plant, Unit 2 – Aging Management Audit Plan Regarding the Subsequent Licence Renewal Application Review
04/28/2025 04/29/2025 05/8/2025 08/7/2025 08/28/2025 10/1/2025 11/14/2025 11/14/2025 ML25106A069 ML25113A094
ML25106A050 (90 FR 19535)
ML25202A136 ML25240B655 ML25274A131 ML25262A143 ML26054A008
NRC. H.B. Robinson Steam Electric Plant, Unit 2 – Subsequent Licence Renewal Application Acceptance Letter
NRC. H.B. Robinson Steam Electric Plant, Unit 2 – Subsequent Licence Renewal Application Online Reference Portal
NRC. H.B. Robinson Steam Electric Plant, Unit 2 – Subsequent Licence Renewal Application Acceptance FRN
NRC. H.B. Robinson Unit 2 – Schedule Revision for the Subsequent Licence Renewal Application Review
Duke. Supplement No. 1 – Changes
to the Robinson, Unit 2, Subsequent Licence Renewal Application
Duke. Supplement No. 2 – Changes
to the Robinson, Unit 2, Subsequent Licence Renewal Application
NRC. Aging Management Audit Report
NRC. Aging Management Audit Report Supplement
consistent with exception and enhancement. One was not applicable. One example is the Buried and Underground Piping and Tanks programme. The staff examined 19 enhancements to this existing programme. Several enhancements refer to additional inspection:
● An inspection method that has been demonstrated to be capable of detecting cracking when inspections of uncoated stainless steel piping are performed.
● Inspect controlled low strength material backfill for cracking that could admit groundwater to the external surface of the embedded pipe.
The HB Robinson nuclear plant in Hartsville, South Carolina, was commissioned in 1971 after a four-year build programme. Source: Duke Energy
● Additional inspections when measured pipe wall thickness, projected to the end of the subsequent period of extended operation, does not meet the minimum pipe wall thickness requirements due to external corrosion.
● Visual inspections of buried steel piping in the fuel oil system at least once every ten years. Visual inspections of at least one ten-linear-foot section of buried stainless-steel piping in the primary and demineralised water makeup system at least once every ten years.
32 | October 2026 |
www.neimagazine.com
● Visual inspections of at least two ten-linear-foot sections of underground coated steel piping in the condensate or service water systems at least once every ten years.
● Visual inspections of at least one ten-linear- foot section of underground uncoated stainless steel piping in the auxiliary feedwater, chemical and volume control, condensate, primary and demineralised water makeup, or service water systems at least once every ten years.
● Visual inspections of the concrete encapsulated components in the north service water header.
Renewing the licence A licence renewal application must include an Updated Final Safety Analysis Report (UFSAR) with a summary description of the applicant’s programmes and activities for managing the effects of ageing. Time limited ageing analyses must be identified and updated for the period of extended operation, demonstrating that these analyses will remain valid, that the analyses have been projected to the end of the period or that the effects of ageing will be adequately managed. The requirements for licence renewal are described in 10 CFR Part 54. One section, ‘Contents of application – technical specifications’,
requires that the SLRA include any changes or additions to the technical specifications that are necessary to manage ageing effects during the period of extended operation. Duke stated that no changes to technical specifications are necessary for issuance of a subsequent renewed operating licence and the NRC staff found that this statement adequately addresses the requirements. An item is considered to be open if the NRC staff
have not determined that the item meets all applicable regulatory requirements. After reviewing the SLRA, including additional information the staff identified no open items. An item is considered confirmatory if the staff and the applicant have reached an acceptable resolution that meets all applicable regulatory requirements but, at the time of the issuance of this SE, the staff had not received the necessary documentation to confirm the resolution. After reviewing the SLRA, including additional
information, the staff found no confirmatory items exist that require a formal response from Duke. After reviewing information submitted up to 1 October 2025, the NRC staff
deemed two licence conditions appropriate: ● Following the staff’s issuance of the subsequent renewed licence, Duke has to include the UFSAR supplement (containing a summary of programmes and activities for managing the effects of ageing and an evaluation of time limited aging analyses) in its next periodic UFSAR update
● Duke is required to complete future activities described in the UFSAR supplement no later than six months before the beginning of the subsequent period of extended operation and must also notify the NRC in writing when it has completed those activities. Unless modified in accordance with 10 CFR 50.59, the programmes and commitments described in the UFSAR supplement remain in effect during the subsequent period of extended operation. ■
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53