HB ROBINSON RENEWAL | LIFE EXTENSION


Renewed licence Both initial and subsequent licence requirements for


power reactors are based on two principles: ● The regulatory process is adequate to ensure that the licensing bases of all currently operating plants maintain an acceptable level of safety with the possible exception of the detrimental ageing effects on the functions of certain systems, structures, and components and a few other safety related issues during the period of extended operation.


● The plant specific licensing basis must be maintained during the renewal term in the same manner, and to the same extent, as during the original licensing term.


Active equipment is adequately monitored and maintained


by existing programmes and is not subject to an aging management review (AMR), because ageing effects can be readily identified and corrected through existing programmes. A licence renewal applicant must identify SCs subject to an AMR, which are those that perform an intended function without moving parts, or without a change in configuration or properties, and are not subject to replacement based on a qualified life or specified time period. The applicant must demonstrate that the effects of ageing will be adequately managed and the SC functions will be maintained during extended operation. The NRC staff evaluated the applicant’s


AMRs for components subject to one in six SC categories: ● Reactor vessel, internals and reactor coolant system ● Engineered safety features ● Auxiliary systems ● Steam and power conversion systems ● Supports for containments, structures, and components ● Electrical and instrumentation and controls.


An example of the licence application examination was


concerned with the Dry Agent Suppression System. This gaseous fire suppression system is designed to support safe plant shutdown and is used in specific switchgear relay rooms and in the Hagan Relay Room adjacent to the control room. Components of the fire suppression system are passive and long-lived, so they are subject to an AMR. Extensive review by the NRC staff was followed by a


virtual audit with Duke staff to discuss fire protection scoping and screening topics. The staff discussed breakout session audit questions, interviewed Duke personnel and examined supporting documentation. During the discussion, Duke staff addressed NRC staff’s questions about whether various Dry Agent Suppression System components were within the scope of SLR and subject to


an AMR. These components included: ● Clean agent fire suppression system storage bottle ● Pressure regulator ● Accumulator ● Valve body ● Clean agent distribution manifold.


These components are replaced based on condition


monitoring in accordance with approved facility procedures and are treated as consumables; therefore, they are not subject to an AMR. However, they remain part of Robinson’s maintenance programme, which includes periodic functional testing at the required frequency. Duke staff indicated that the Robinson clean agent system does not include pressure regulator or


www.neimagazine.com | October 2026 | 31


Table 1: Timeline of the HB Robinson licence renewal programme Milestone


Receive Subsequent Licence Re-newalApplication (SLRA) Publish Letter – SLRA Availability


Publish Letter – Docketing Acceptance/Rejection and Opportunity for Hearing


Publish Federal Register Notice FRN – Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping


Environmental Scoping Period Ends


Deadline for Filing Hearing Requests and Petitions for Intervention


Issue Draft Supplemental Environmental Impact Statement (SEIS)


Draft SEIS Comment Period Ends Issue Final SEIS


US Environmental Protection Agency FRN Published – Availability of Final SEIS


Issue Safety Evaluation Report Decision – Director, Office of Nuclear Reactor Regulation


accumulator. However, their valve body and distribution manifold are required for compliance with fire protection regulations and subject to an AMR. Clean agent cylinders for the Dry Agent Fire Suppression System undergo regular inspection and replacement as required by NFPA 2001 and therefore are not subject to an AMR. The NRC staff concluded that HR Robinson appropriately identified the Dry Agent Suppression System components within the scope of SLR and the system components subject to an AMR. In its final report the NRC staff compared 48 AMPs (nine new and 39 existing) with the NUREG 2191 GALL-SLR Report. It found 15 consistent with GALL-SR, 28 consistent with enhancement, three consistent with exception and one


Scheduled Actual 04/2025


04/2025 05/2025 05/2025 06/2025 07/2025 12/2025 01/2026 03/2026 03/2026 04/2026 04/2026


04/01/2025 04/08/2025 04/28/2025 05/22/2025 06/23/2025 07/07/2025 12/22/2025 02/23/2026 03/12/2026 03/20/2026 04/01/2026 04/23/2026


HB Robinson is the second nuclear facility in Duke Energy’s fleet to receive a second licence renewal after Oconee Nuclear Station received its second renewal in March 2025. Source: ANS


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53