search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
USER GUIDE


Matters needing attention when the K-kit is in use


With Newton’s rings


SPECIFICATIONS K-Kit Carrier


K-Kit Die Grid Step Cap Seal Sealed by channel tips


Inspection Before Use With Newton’s rings on the membrane. (Be sure to keep the channel vacuum sealed)


Silicon body of K-kit should be damage-free. K-Kit Stand K-Kit


Each carrier has a K-kit attached on top, protected with a clear cap. (A copper grid is enclosed at the bottom of the carrier.)


Flat membrane


Base


Dimensions Window Length: Open to atmosphere Channel Tips Removal


Be sure to remove both the channel tips before using K-kit.


It should be finished the liquid loading within 0.5 hour, after breaking the channel tips.


With color patterns (After liquid filled)


300µm, Width 25µm


Channel Height (H): 0.2 and 2.0 standard 0.5, 1.0 and 5.0 available


H = 0.2µm, 0.5µm, 1µm, 2µm, 5µm


Liquid Loading


Keep the K-kit steadily touching on liquid for around 1 minute, to allow the filling to complete.


Do not immerse the K-kit in liquid.


Liquid well reserved (glue the openings soon)


Gluing Process


Glue both ends of the channel within 1 minute after liquid loading.


Be sure not to do the channel gluing step, if making for Thin Layer mode of K-kit.


Take care during the gluing step, to avoid the glue flowing into the observation window.


12


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16