Grid Transmission Procurement – Indicative Timing Interface with Suffolk CC and LPAs
RFQ Issue
April ‘13
Initial Bid 4months
Initial design proposals
Evaluation (4 months)
RFQ
Receipt Sept ‘13
Shortlist
Recommendation Jan ‘14
Design optimisation Complete May‘14
Optimised Bid
4 months
Optimised design for pricing
Evaluation (2 months)
Award subject to FID
July. ‘14 Design
Finalisation 8 months
Detail design for construction
FID / NTP (March. ‘15)
Execute Contract Discharge
Requirement 10
Order materials and equipment Enabling works
Detailed Design
Complete March ‘15
Building Design Update Consult on Landscaping
Building Design Update Consult on Landscaping
Building Design Update Consult on Landscaping
2
20/11/2013 Diagram 1 – Grid Transmission Procurement © Crown copyright. All rights reserved. 2012 Licence number 0100031673. © EAOL 2013.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23