EA One Delivery Plan Activity ID Activity Name


EAOne DeliveryPlan Regulatory Dates


A1180 A1190 A1440 A1450 A1470 A1480


Geotech A1330 A1370


GRID


A1000 A1010 A1020 A1030 A1040 A1050 A1210


Foundation A1060 A1070 A1080 A1090 A1100 A1110 A1120


WTG


A1130 A1140 A1150 A1160 A1170 A1200 A1220 A1230


Array Cable A1390 A1400 A1410 A1490


Ports


A1420 A1430 A1460


Port Selection Sign Option for Lease Port Design and Construction ContractAward WTGManufacturing


WTGInstallation - 1st Phase WTGInstallation - 2nd Phase WTGInstallation - 3rd Phase


Tender Phase (Manufacturing & Installation) Preferred Supplier Detailed Engineering


ContractAward Cable Fabrication Cable Installation


Tender Phase (Manufacturing & Installation)


Preferred Supplier ContractAward


GRID Manufacturing GRID Installation


First Power Available Tender Phase


Detailed Engineering


Nominate Shortlisted Bidder ContractAward Jacket Fabrication Pile Manufacturing Pile Installation


Jacket Installation Tender Phase (Fabrication & Installation)


TCD 1st Phase Commissioned Full Export


Planning Consent


CFDApplicationWindow EAOne CFD FID


Geotech Survey Laboratory Testing and Reporting


Original Start Duration


Finish


1283 16/06/2014A 01/10/2019 1282 18/06/2014A 01/10/2019 0


0 0


10 14/10/2014* 0 0


Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 2014


2015 2016 2017 2018 2019 2020


03/04/2019 01/10/2019* 18/06/2014A 27/10/2014 29/01/2015* 29/01/2016*


194 17/07/2014A 14/05/2015 21 17/07/2014A 19/12/2014


194 29/07/2014A 14/05/2015 1156 22/07/2014A 31/03/2019


0 0


323 13/05/2016* 696 29/07/2016* 0 31/03/2019*


225 22/06/2015 1175 01/09/2014


0 0


352 17/10/2017* 428 02/07/2017* 90 02/10/2018* 180 02/12/2018* 231 15/12/2014*


19/06/2015* 29/01/2016* 08/08/2017 29/03/2019


1 22/07/2014A 19/06/2015 13/05/2016 30/05/2019


01/09/2014* 29/01/2016* 21/03/2019 02/09/2018 30/12/2018 30/05/2019 18/11/2015


1248 16/06/2014A 12/08/2019 0


408 04/09/2017* 47 11/02/2019* 45 30/03/2019 91 14/05/2019


253 15/12/2014 1100 26/01/2015


0


300 01/05/2018* 150 02/02/2019* 200 26/01/2015* 514 04/12/2014


120 04/12/2014* 0


230 01/02/2016


29/01/2016* 29/04/2019 29/03/2019 13/05/2019 12/08/2019


1 16/06/2014A 12/12/2014 0


12/12/2014 18/12/2015 01/07/2019


29/01/2016* 24/02/2019 01/07/2019 06/11/2015 23/12/2016


04/06/2015 29/01/2016* 23/12/2016


Preferred Supplier


TCD 1st Phase Commissioned Full Export


Planning Consent 14/10/2014*


CFDApplicationWindow EAOne CFD


FID


17/07/2014A, 17/07/2014 A Geotech Survey


29/07/2014A, 29/07/2014 A Laboratory Testing and Reporting


Preferred Supplier ContractAward


GRID Manufacturing 13/05/2016* 29/07/2016* Tender Phase 22/07/2014A, 22/07/2014 A 22/06/2015 Nominate Shortlisted Bidder ContractAward Jacket Fabrication 17/10/2017* 02/07/2017* 15/12/2014*


Tender Phase (Fabrication & Installation) ContractAward


04/09/2017*


Pile Manufacturing 02/10/2018*


02/12/2018* Pile Installation Jacket Installation Detailed Engineering GRID Installation


31/03/2019* First Power Available


WTGManufacturing


11/02/2019* WTGInstallation - 1st Phase


16/06/2014A, 16/06/2014 A Tender Phase (Manufacturing & Installation)


15/12/2014


Detailed Engineering ContractAward


Cable Fabrication 01/05/2018* Tender Phase (Manufacturing & Installation) 26/01/2015* Port Selection 04/12/2014* Sign Option for Lease Port Design and Construction 01/02/2016 02/02/2019* Cable Installation


30/03/2019 WTGInstallation - 2nd Phase


14/05/2019 WTGInstallation - 3rd Phase


Remaining Level of Effort Actual Level of Effort


ActualWork RemainingWork


Critical RemainingWork Milestone


Page 1 of 1


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87