 Network Innovation Allowance (NIA): SPR is actively workingwith SPEN to support the development of NIA projects that impact on offshore transmission infrastructure, including a project looking at Low Frequency AC (LFAC) for offshore connections. LFAC has a potential to reduce the cost of offshore transmission technology for projects beyond 150kmfromthe onshore connection point by around 30- 50%, as well as offering an alternative to HVDC bootstraps in the onshore transmission network. SPEN will demonstrate LFAC in 2015 which should advance commercialisation of this technology. [I5] {iii}


 ORE Catapult – EA1 case study: Due to the limited deployment of HVDC solutions for offshore wind, further refinement can be done to optimise the architecture and key parameters of the transmission system. ORE Catapult is seeking to explore this area and EA1 is keen to use the EA1 Project as an example case. Even if (due to timing and commercial reasons), the EA1 Project is not in a position to fully adopt the results, EA1 recognises the value of such an activity to future EA Zone projects and the wider industry, as it explores ways to reduce cost of transmission, especially for far fromshore projects. [I1,I2,I4] {ii, iii}


 Marin-El project – Iberdrola’s Engineering and Construction division is designing a new self-installing offshore substation concept with a view to accelerating installation and significantly reducing the costs of offshore wind projects. This is a £8.3M(€10M) project, supported by the Basque Government and is highly relevant to future EA zone and other offshorewind projects. [I2,I4] {ii,iii}


3.2.10 Package specific action


 EA1 project teamactivity: EA1 is actively looking at improvements in transmission technologies to reduce the future costs of offshore wind, including: [I2] {iii}


o Improved classic 50Hz AC systems o Optimised DC solutions, simplifying the technology and reducing the offshore footprint.


o Actively investigating alternative technologies such as low frequency alternating current to improve offshore transmission costs.


o Engaging with a wide range of suppliers and emerging suppliers to understand the development of transmission technologies from2020 to 2030.


3.2.11 Shortlisted supplier innovation: The HVDC substation option offers significant opportunity for innovation, both in the design but also in installation. The shortlisted suppliers each have significant R&D programmes running and, following award, there will be a process tomanage a range of innovations to incorporate into the solution for the EA1 Project.


 Grid optimisation: EA1 is considering sizing the transmission systemto bemore reflective of actual usage, as discussed in The Crown Estate’s OffshoreWind: Cost Reduction Pathways Study. This is because the full rating of the transmission systemis rarely fully used, due to the lack of correlation between sufficient wind speeds formaximumgeneration and the availability of all turbines to generate at this time. This could be amore cost effective alternative to a full rated system. [I2] {ii, iii}


3.3 Innovative procurement or contracting practices [I3]


3.3.1 Tier 1 supplier commitment to competition, innovation, skills & UK benefit: A key requirement of EA1’s tender process is the request for suppliers to prepare supply chain plans as noted at 2.8.1 which specifically address their approach and future actions to further innovation in the industry. This is a new and innovative means to promote competition, innovation, skills and UK content and drive these commitments through the various supply chain tiers. Following supplier award EA1 will dedicate resource to ensure that the innovation commitmentsmade by its suppliers are delivered andwill be tracked at appropriatemilestones. [I3] {ii, iii}


3.3.2 WTG Optimisationwork stream: EA1 has challenged its shortlistedWTG suppliers through a dedicated optimisation work streamto demonstrate how further innovation can be implemented through theirWTG supply and installation offers. This work has been structured by examining the following six key areas with each supplier: [I1,I2,I3,I6] {ii}


 Optimal windfarmlayout  Wind turbine upgrade opportunities  Optimised O&Mapproach  Early revenue delivery


Page 21 of 30


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87