PROJECT REPORT: ADAPTIVE REUSE
ATRIUM AT THE HEART
What was an inaccessible internal courtyard is now a connecting atrium that forms the heart of the building
materials that were being reused throughout the project.
The new design was modelled down to a granular level in BIM, meaning the project was entirely drawing-free. “The building was modelled in extraordinary detail, enabling accurate planning, cost control and construction coordination,” explains Tväråna. The BIM model became the only construction document, allowing all information to be accessed by individuals and teams working on their project via their phone or tablet. “This was particularly valuable on a reuse project, where existing materials and components vary far more than standard new build products,” adds Tväråna.
It also allowed climate calculation experts to perform necessary ongoing calculations based directly on the model, and overall reduce the risk involved – particularly in a project of this size. “Combined with continuous laser scanning, the 3D model helped us identify and resolve irregularities in the existing structure early on, reducing risk and making the large-
WWW.ARCHITECTSDATAFILE.CO.UK
scale transformation far more effi cient and predictable,” Tväråna says.
Green ambition
Sustainability was not merely a consideration, but was an important part of the brief from the outset of the project. Vasakronan targets LEED Platinum certifi cation on all its developments, with 97% of its current portfolio environmentally certifi ed – 95% of which have achieved LEED Gold or higher. The developer pursues this strategy for two principal reasons; fi rstly a belief it is the responsible thing to do – focusing on areas such as energy use, material use, waste and transport. Secondly, its ‘green fi nancing strategy’ means it seeks fi nancing from investors who look for sustainable or green investments. Targeting LEED certifi cation therefore gives investors confi dence that Vasakronan are able to fulfi l the lending criteria.
Measures undertaken on Lumi – aside from the enormous reuse and recycling effort – include the integration of roof
ADF OCTOBER/NOVEMBER 2026
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108