PROJECT REPORT: ADAPTIVE REUSE


“What attracted us was the opportunity to challenge the assumption that demolition was the only viable option” Anders Tväråna, White Arkitekter


addition of three new fl oors. Strengthening the foundations “was not an option,” so the architects had to fi nd another solution. The original load-bearing concrete facade was replaced with a lighter structural system, and the three new fl oors were constructed using lightweight materials – namely lightweight steel and cross-laminated timber (CLT). Lightening the existing load on the foundations meant they were able to construct the new fl oors while keeping the overall load roughly the same, “making the transformation both technically viable and resource effi cient,” Tväråna adds. Coordination and collaboration between White Arkitekter, Vasakronan, the engineers and building managers were essential in ensuring the success of the project. “The structural engineer played an especially important role, helping us understand the building’s constraints and identify solutions that made it possible to preserve and adapt the existing building,” Tväråna says. As well as retaining and reusing the entire foundation structure, approximately 80% of the frame was saved. The team reused as much as possible that could realistically be retained or recycled. This included 70% of the sheet aluminium from the old roof, processed and “woven into the surface of the lift tower wall in the atrium,” over acoustic material, explains the architect. In


WWW.ARCHITECTSDATAFILE.CO.UK


addition, 105 tonnes of plasterboard were dismantled and reinstalled. Bricks, cabinets, 563 interior doors, and 383 glass partitions were also carefully dismantled to be reconditioned and reused, as were 446 radiators, electrical boxes and other technical equipment. Carpet tiles throughout the building are either recycled or reused, thanks to a partnership with Tarkett. While the original building’s fl ooring wasn’t good enough for reuse, the manufacturer sourced carpet tiles that were due to be torn up in other projects, fresh enough to be reconditioned. Overall, the fi nal carbon footprint of the building is approximately half that of a new timber framed house on the site – a decrease of 3,700 tonnes of CO2


emissions.


While determining how much of the buildings could be saved, recycled and repurposed was highly important, so too was redesigning and reconfi guring the site in order for it to meet modern standards and requirements. “Our solution was to turn the inward-facing complex inside out, replacing its single entrance with a shared atrium that connects all three buildings,” explains Tväråna. “Placing the new entrance within the atrium, alongside a central staircase, new lifts and bridges linking directly to the offi ce fl oors resolved the logistical challenges and created a space


ADF OCTOBER/NOVEMBER 2026


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108