search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
STRUCTURAL ELEMENTS; EXTERNAL ENVELOPE 51


RENOLIT ALKORPLAN’s analysis supports Stihl panels on 6,200 m2


RENOLIT ALKORPLAN roofi ng products proudly announces the successful completion of a signifi cant project at Stihl’s logistic hub for the Iberic peninsula, situated in Torres de la Alameda, Madrid, Spain. This initiative involved the installation of photovoltaic of existing RENOLIT ALKORPLAN Bright


membrane, leveraging the innovative RENOLIT ALKORPLAN Solar Profi le. Beyond the effi ciency provided by the product itself, this project notably underscored the crucial role of comprehensive technical service prior to installation.


www.renolit.alkorplan.com


Easier anchor dimensioning and selection


A new version of EJOT’s Anchor Fix software enables easier development of anchoring designs and specifi cations for heavy-duty and safety- critical applications. Free to download from the EJOT website, Anchor Fix 2025 allows different fastening options in the EJOT through-bolt, resin anchoring and LIEBIG heavy-duty anchor


ranges to be compared with ease, saving time and cost. Increased fl exibility comes with new functionality so standard and bespoke fastening options for different applications can be compared accurately, without being constrained by design code EN 1992-4.


01977 687040 www.ejot.co.uk Protect your asset with a TORMAX automatic door service contract


Automatic doors have become the standard for modern buildings, with key access points often being integral to the smooth functioning of the premises. TORMAX UK provides nationwide coverage through its team of service engineers, offering 24-hour emergency callouts alongside scheduled maintenance and repairs for almost any automatic door system. A TORMAX Planned Maintenance Contract (PMC) allows for regularly scheduled servicing, ensuring the entrance always complies with current health and safety standards and maintains optimal performance. “Today’s automatic door systems are more advanced than ever,” says Simon Roberts, MD for TORMAX UK. “Over time, dirt, leaves, and other debris – or even water infi ltration during heavy rain - can impact the system’s performance or lead to complete failure. Regular, comprehensive servicing helps detect potential issues early, preventing long-term damage and keeping key components functioning at their best. “Our goal is always to repair rather than replace, reducing costs and disruption. With every engineer carrying a comprehensive range of spare parts, we can often complete repairs on the fi rst visit.”


sales@tormax.co.uk


ADF NOVEMBER/DECEMBER 2025


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76