PROJECT REPORT: HERITAGE & HISTORIC
LIMITED PALETTE
Feilden+Mawson was appointed at RIBA Stage 2 to develop a scheme which reinstated original elements but also introduced a limited palette of materials and colours to make additions “cohesive but also distinct”
wanted a transparent lift to enable visitors to read the interior of the building as they moved vertically between fl oors. A degree of transparency was ultimately achieved by using mirrors on the lift’s interior. Some ambitious opening up of the
keep structure was required in the design in order to create a fully accessible and fi re compliant building – it can now
accommodate up to 500 people at any one time – and ensure at least two means of escape from any location inside.
Precision tunnelling
Creating a new doorway through the three-metre-thick north face of the keep at ground level meant precision tunnelling through solid stone. The structural engineer developed a clever metal structure that could be progressively inserted and bolted together inside the one-metre wide
opening to maintain structural integrity as 100 mm sections of wall were removed. The
WWW.ARCHITECTSDATAFILE.CO.UK
painstaking process took six months. “If they had tunnelled a little bit too far to the right or to the left we would have been in trouble, potentially hitting a buttress or a retained Norman sill, which at would have been a disaster as far as Historic England were concerned,” says Davidson, adding that the same opening served as the entrance point for the main contractor to bring in all the project’s steel work. Another opening was created on the east side of the keep to enable wheelchair access to the principal fl oor via a bridge connected to the 1960s museum block east extension. “The client wanted to make sure that anyone needing assistance to get up to the principal fl oor was still brought in on a very noble historic route and wasn’t squirrelled away on some weird back access staircase,” said Davidson.
Mix & match
While the bridge itself is modern with a timber fl oor and glazed roof and walls, the design of the door opening had
ADF JUNE 2026
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68