search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
ROUND TABLE REVIEW 27 BUILDING


INSIGHTS LIVE


Round table chair, ADF editor James Parker


Keeping Fabric First in Future Homes Standard Compliance


A


round table of housebuilders, consultants, academics and supply chain representatives convened earlier this year to discuss how to maintain a focus on building fabric for housebuilders complying with the new Future Homes Standard (FHS), in a context of demanding new home delivery targets in England. The meeting had some particularly important insights around how to ‘keep fabric fi rst,’ and therefore obey the original maxim behind the standard, in the face of an industry narrative dominated by heating and renewable technologies, and operational carbon rather than upfront embodied carbon. The event was held at London’s Building Centre, and was sponsored by Kingspan Insulation, engineered timber provider Medite Smartply, membranes supplier Don & Low, Tarmac Group, Keystone Lintels, and windows fi rm Eurocell. Shortcomings in the fi nal published FHS consultation response were highlighted by delegates, although the fi nal implications for housebuilders would not be clear until the publication of the Home Energy Model, expected to come into force in March 2027 alongside the FHS. The fabric requirements themselves didn’t move far beyond the Part L 2021 improvements, apart from a small uplift in air-tightness, and a more rigorous way of calculating window performance, but the response confi rmed many key compliance aspects such as the PV requirement. Delegates particularly criticised the fi xed ‘functional requirement’ for 40% of the ground fl oor area to be roof-mounted solar PV, constraining design fl exibility around other options for compliance. Other challenges raised included the persistent performance gap between design and built homes, and how value engineering hampered robust materials specifi cation. In particular, skills shortages across the delivery chain were a barrier to prioritising fabric, and delegates said that even the emergence of the Standard itself, with its associated costs, was thought to have prompted more people to leave the industry. However, with the Government not backing up challenging building targets with good engagement with industry, the sector was likely to have to deliver the initiatives required, from skills to offsite building innovation. Solutions from triple glazing to Building Passports, as well as the likely impacts of


MULTI-DISCIPLINARY VIEWS ON THE MATERIAL REALITIES The round table once again brough together leading voices from the construction sector with suppliers, to explore the practical realities of compliance


the new National Planning Policy Framework, were all discussed in a practical and highly engaged way at the round table.


Broad-based debate To give a broad-based picture of the issues around keeping fabric fi rst, the conversation included leading housebuilders, a range of consultants, and sponsors’ representatives. While the Standard has confi rmed many compliance aspects, and the transitional arrangements extending until 24 March 2028, delegates said HEM will be essential for clarifying the trade-offs and balances that housebuilders and designers will need to make in schemes. Industry bodies and associations engaged in advocating a fabric focus in future homes included the Insulated Render and Cladding Association (INCA), the Insulation Manufacturers Association, the Association of Environment Conscious Building (AECB), and The Green Register. The debate took a deep dive into the onsite challenges, the systemic skills gap facing the sector, and possible


ADF JUNE 2026


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68