INTERIORS 65
A variety of Schlüter-KERDI products aid in the correction of previous installation
I
t
is
not
unusual
for
tile
and
stone
protection experts Schlüter-Systems to be called upon when a bathroom or wetroom installation fails. If the preparation hasn’t been executed to the appropriate standard, it will likely lead to failure later down the line. If this is the case, recognising and rectifying this before any further work is carried out is the best course of action.
An example of this was a residential property in Lancashire which saw a variety of Schlüter-KERDI products aid in the correction of a previous installation, resulting in a stunning high-end steam room ensuite. Although the task at hand was a challenging one, Steve Wagstaff of Pro-Tilers UK was not deterred. Initially brought in to finish off the project with the addition of some beautiful tiles, he saw that the original work was not up to scratch.
Having previously attended one of Schlüter’s
popular training courses, Steve
became well versed in all things orange. He comments: “After seeing what the client was left with, it became clear that we needed a reliable solution to get it right this time around – Schlüter products have always worked well for us especially in this type of area, so it was the perfect fit.” This quickly put the client at ease and reassured them that the products chosen would assist in the necessary course correction.
ADF06_Schluter_Interiors - Bathrooms_Full Page
Advertorial.indd 1 ADF JUNE 2022
Once this decision was made, Steve got to work installing Schlüter products within the shower/steam area of the ensuite. He created two benches using the popular tile backerboard Schlüter-KERDI-BOARD, which became a prominent and beautiful feature within the room once finished. This process was simplified using Schlüter- KERDI-BOARD-ZB, a U-shaped stainless- steel profile,
which specifically connects
structures made from panels of Schlüter- KERDI-BOARD.
The steam room section, which was separated by a glass screen, was waterproofed
using Schlüter-KERDI-DS along with Schlüter-KERDI-COLL-L and sealing band Schlüter-KERDI-FLEX giving a reliable and long-lasting waterproof solution. To finish off the steam area, a frameless Schluter- KERDI-LINE-DRAIN was installed, nestled between the benches for a seamless and attractive tiled finish. As a piped, water-fed, underfloor heating system had already been installed, it made sense to add the uncoupling membrane Schlüter-DITRA-25 on top of it to ensure that the tiles could be installed without any issues of cracking later down the line. Steve concludes: “The team at Schlüter were on hand to provide advice and support throughout this entire process. They suggested out of the box ideas for the space and were quick to come back with the perfect Schlüter solution. We were thrilled to see how pleased the client was with the finished steam room that they could finally enjoy using.” Illustrating the importance of sub- surface preparation using a variety of Schlüter products and solutions, the result of a stunning steam room has given the homeowner a calming and relaxing space within their home to enjoy for many years to come.
01530 449513
www.schluter.co.uk
25/05/2022 12:22
WWW.ARCHITECTSDATAFILE.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84