STRUCTURAL ELEMENTS


as three hours. Quicker, two-coat, water-based systems are also available that will create an effective barrier against residual construction moisture where relative humidity values are up to 95%. The first coat cures in 15-20 minutes. A further 30 minutes curing time is required for the second coat.


The application of a liquid waterproof surface membrane is the usual solution for effectively controlling dampness


will be required to determine the precise subfloor relative humidity levels and if a moisture management solution is required. The only method of measuring subfloor relative humidity levels with certainty, and the method advocated by British Standards, is to use a calibrated hygrometer. These devices measure the relative humidity of a small volume of confined air in equilibrium with the subfloor, taking into account the ambient temperature.


The device is affixed to the subfloor using butyl tape to create an airtight seal around the base of the instrument. It is then left for a sufficient amount of time to allow entrapped air to reach moisture equilibrium with the screed or base before the unit is switched on. Equilibrium can generally be assumed after leaving the instrument overnight and readings taken four hours apart are identical. It is recommended that multiple digital hygrometers are placed at regular intervals across the entire subfloor area to avoid the prospect of localised excess moisture not being detected.


Waterproof surface membranes There are a number of options available to contractors for creating a barrier to protect the floorcovering from high levels of moisture detected within the subfloor. The application of a liquid waterproof surface membrane is the usual solution for effectively controlling dampness. The best-performing epoxy waterproof surface membranes will isolate excess subfloor moisture where relative humidity values are up to 98%, with a single coat application, which will fully cure in as little


WWW.ARCHITECTSDATAFILE.CO.UK


An alternative solution An alternative solution for dealing with damp is available for where a waterproof surface membrane cannot be applied. This may be the case where flooring installations are part of a refurbishment project and screeds are contaminated with oil, other chemicals or old adhesive residues. It is also useful in heritage settings where the subfloor must be preserved. In these situations, a loose-lay isolator membrane can be laid directly onto the subfloor, without the requirement for an adhesive, to provide a barrier to stop excess subfloor moisture causing floor failure. These membranes typically have nodules on the underside, creating an airspace to allow water vapour to travel to the edge of a room, into a dry wall or ventilated area, where it can safely escape. A wide range of floorcoverings can be adhered to its upper surface. This enables durable new floors to be installed and easily removed at a later date, allowing buildings to be returned to their original state and offering a solution for temporary flooring installations.


Next steps


When a suitable moisture management solution is in place, contractors can proceed with preparing the subfloor for the installation of new floorcoverings. Where an isolator membrane has not been used, this should include the application of a levelling compound to create a perfectly smooth base for the receipt of floorcoverings, remembering to prime beforehand if necessary.


Contractors can proceed to install floorcoverings using an appropriate adhesive once the levelling compound has cured. At this stage, the compatibility of particular floorcoverings and adhesives should be checked to further ensure against floor failure. To do this, contractors can consult the adhesive manufacturer’s Recommended Adhesives Guide or see the floorcovering manufacturers’ instructions.


Stephen Boulton is technical service manager at F. Ball and Co


ADF JUNE 2022


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84