“It’s exciting to be given a blank box, but it’s even more exciting when it has so many layers to it” Michael Kieck, MoreySmith
original structure. It further defers to the original building by being set back from both of the latter’s long facades, and its dark-coloured materials “keep it in the shadow of the Listed structure,” asserts Partridge. With the Generator Building being located within the flood zone of the adjacent floating harbour, Staffordshire blue bricks were required from the ground to the first floor with the remainder of the extension using a dark grey cladding.
Internal interventions As well as updating the building’s envelope, The Bush Consultancy were consented to alter the internal arrangement while MoreySmith worked on the interior design in line with Clockwise’s and Castleforge’s ambitions. Partridge explains that “a key consideration of the consents was that our additions can easily be removed without affecting the original structure.” For example, the sixth floor has been created from a stand-alone steel frame that sits on the fifth floor slab and fixed to the external walls, and studwork to new partitions have
WWW.ARCHITECTSDATAFILE.CO.UK
minimal fixings into the glazed brick. The fourth floor mezzanine extension was to an existing 1980s intervention, namely the added floor which it largely replaces. The ground floor boasts meeting rooms, event space and a bar, with an adjacent cafe lounge area which Michael Kieck of MoreySmith describes as the building’s “social heart space.” The atrium adjacent to the main entrance required Bush to remove part of the first floor. This alteration was to a structure provided as part of the 1980s development, and so didn’t affect the original layout.
Starting on the first floor, dedicated work sections with breakout tea zones with kitchenettes and soft seating encourage cross collaboration and interaction, which continues on the upper levels. “It’s like a small market space for businesses. As there is so much transparency, you are aware of who’s in the spaces, and you can ‘tag team’ projects or clients,” says Kieck. While there is access to a lift at the rear, the raw metal staircases are located in areas that mean occupants generally have to
ADF FEBRUARY 2023
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108