search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
98 SAFETY & SECURITY Venting about spec quality


Tony Stevens at Bilco UK explains ‘NSHEVs’ – a ‘natural’ approach to ventilating spaces during fires – and factors that architects need to address when considering it


quality, affirming the safety of the building for its entire lifecycle.


When a fire ignites in an enclosed space, the smoke rising from the fire gets trapped by the ceiling. It then begins to spread, forming an expanding layer that leaks into any gaps in the floors or walls. This can lead to individuals becoming disorientated, and their vision becoming increasingly impaired, hindering safe evacuation. NSHEVs protect building occupants by preventing the excessive build-up of smoke and noxious fumes by exhausting the smoke quickly and safely. This reduces the risk of smoke inhalation and damage, horizontal fire spread and secondary ignitions. In the event of a fire, units also improve visibility, accelerating evacuation times and assisting firefighters.


ccording to The National Statistics Survey for fire and rescue services in England, smoke inhalation is the leading cause of death in fires, and was responsible for 34% of fire-related deaths in 2018/2019. As an architect or specifier, ensuring the right Natural Smoke and Heat Exhaust Ventilator (NSHEV) is installed is paramount to ensuring the product is fit for purpose for the chosen application, and provides the highest levels of safety and compliance.


A


Understanding the importance of NSHEVs It is a specifier’s responsibility to ensure that the correct product is used in the right context and is manufactured to the highest


WWW.ARCHITECTSDATAFILE.CO.UK


Ensuring constant compliance When specifying a NSHEV, it should be fully compliant with the Construction Products Regulation 305/2011, CE-marked with a Declaration of Conformity and manufactured to meet the demands of Building Regulations, Approved Document B, BS9999 and BS EN12101-2. Choosing a smoke vent that meets all of these legislations will help to not only achieve compliance, but ensure the operational reliability and performance of the installation throughout its lifetime.


Customising the design While ensuring compliance and safety is paramount, there are additional aspects that need to be considered as part of the specification process. There are many options to consider when specifying, from aesthetics, to operations and smoke control. When considering smoke control, it’s advised to be in the form of a dedicated management system, or a solution integrated into a wider networked fire alarm system.


A choice of hardware, paint finishes, kerb liners, manual and automated control units,


ADF FEBRUARY 2022


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108