search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
70 EXTERNAL ENVELOPE


Schöck connectors for heavy walkways at new Santander UK HQ


Milton Keynes, is well under way. The development of this exciting, futuristic 44,000 m2


W


ork on the landmark new £150m headquarters for Santander UK, in the business district of central


project, known as Unity Place, is


led by a collaboration between developer Osborne+Co, LOM architecture and design and contractor John Sisk & Son. Scheduled to complete in 2022, LOM’s design for the eight-storey building comprises four blocks connected by three atria. It offers generous employee amenities, including a rooftop bar and running track, garden terrace, restaurant, and a health and fitness centre.


An urban workplace ecosystem Unusually, it also integrates publicly accessible retail outlets, an urban market, community hall and conference and events centre. This invites the wider community to enjoy the space as much as Santander’s employees, making it an urban workplace ecosystem. The building is designed to achieve a BREEAM ‘Excellent’ rating for its environmental sustainability performance and will exceed Building Regulation requirements with a further 20% reduction in CO2 emissions.


15 tonne walkways demand substantial thermal breaks One of the many interesting features of the new Santander UK HQ are the green garden bridges, where landscaped walkways link the


Image courtesy of LOM architecture and design


light-filled atria spaces to provide meeting, break out and relaxation areas. There are six of these walkways. Each essentially being an outside bridge which is thermally broken, as it connects to an enveloped, or warm structure. The prevention of thermal bridging is therefore critical at the connectivity points of these structures and with each walkway weighing around 15 tonnes, a substantial structural thermal break connectivity solution was required.


Unique and versatile The answer was the versatile Schöck Isokorb T type S structural thermal break,


which is the ideal connectivity solution for project applications involving steel-to- steel applications. There are two variants, the T type S-N for tensile force and the T type S-V for transferring compression and shear forces. It is the only approved thermal break product for steel construction that satisfies the load-bearing and thermal insulation requirements of steel design. Also, being a modular unit, it can be


adapted to all profile sizes and load bearing capacity requirements – plus it can be used in both new construction and renovation projects.


All Isokorb products are fully compliant In addition to its comprehensive range of Isokorb solutions for concrete-to-steel, concrete-to-concrete and steel-to-steel – Schöck also offers a maintenance free alternative to wrapped parapets. All products meet full compliance with the relevant UK building regulations and have the security of independent BBA Certification, which provides NHBC approval. The temperature factor requirement (fRSI) used to indicate condensation risk, which for residential buildings must be equal to, or greater than, 0.75 is also easily met by incorporating the Isokorb.


One of the walkways in position


The Schöck Isokorb T type S offers a heavyweight solution


01865 290 890 www.schoeck.com


WWW.ARCHITECTSDATAFILE.CO.UK


ADF FEBRUARY 2022


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108