PROJECT REPORT: MIXED USE SCHEMES 35


Kingfi sher Louvres chosen for prestigious Mayfair development


K


ingfi sher Louvres, a specialist manufacturer of aluminium architectural louvres, has delivered more than 600 acoustic louvre modules and 1600 metres of screening louvre blade for a new award-winning mixed-use redevelopment project incorporating a luxury hotel in London.


Facing the Ritz and located within Mayfair conservation area, Street is a 19,500m2


the One Berkeley development, which


includes the fi rst 1 Hotel outside North America along with offi ces and retail units. It was formed through the refurbishment of two 1970s buildings and retains the vast majority of


original structures, creating a


modules, which provide permanent ventilation combined with the reduction of airborne sound transmission into or out of buildings, together with the company’s KC120 screening louvres helped to provide the perfect blend of acoustic performance and screening.


vibrant,


modern building that is sympathetic to its past. The extensive development, which was delivered by DE Group Contracting, Kingfi sher Louvres’ client and main contractor, features three new extensions including a two-storey rooftop extension. Kingfi sher Louvres’ Technical Sales team collaborated with architects from


Allford


Hall Monaghan Morris to create a solution to screen the plant equipment situated on the roof and to also provide effective sound attenuation to minimise the noise from the HVAC systems. Kingfi sher KA acoustic louvre


A total of 646 acoustically treated aluminium louvres – a mix of KA150/20 modules and KA270/20 modules – were supplied in RAL 7047 matt at different depths to meet the varying sound attenuation requirements for the building. Bespoke penetrations were also required through some of the acoustic louvres on the roof to allow for a man-safe support system – therefore, each penetration needed a specially designed unit. Also, on the roof of the development,


Kingfi sher’s KC120 screening louvres were installed to form several plant screens alongside 10 single doors for access to the plant equipment. As the KC120’s Z-profi le blade can be angled upwards or downwards for screening from any angle, this made it the perfect solution to screen HVAC and other plant equipment. With the project requiring so many bespoke elements, a dedicated assembly line was set up within Kingfi sher’s Nottinghamshire factory. Every louvre panel was allocated a


unique reference that tallied with a layout schedule


to ensure they were


installed


accurately on site. The deliveries to site also had to meet stringent delivery timescales due to the restrictions of a busy Central London location. Darren Rees, Project Manager at DE Group Contracting,


commented, “This


was a complex louvre installation on a very prestigious project. Not only did the louvres have to provide sound attenuation and screening for the plant equipment, they also had to fi t with the architectural aesthetics of the development, as well as incorporating a specialist man-safe system which added to the stringent level of detail that was required. We were delighted with the technical and logistical support provided by Kingfi sher Louvres throughout the project and the subsequent quality of the installed louvres.”


The project won the Best Mixed-Use Scheme at the Building London Planning Awards in October 2024.


For more information, please email


admin@kingfi sherlouvres.com. 01773 814102 www.kingfi sherlouvres.com


ADF APRIL 2025


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68