INTEGRATED THEATRES
Project management risk The inherent complexity of hybrid ORs introduces a level of project management risk that can only be mitigated by the participation and interaction of knowledgeable stakeholders and consultants. Common issues include workflow interruptions, missing software and hardware interfaces, patient positioning challenges, and collisions due to misaligned equipment installation. Hospitals that have successfully implemented their first hybrid OR have taken the following steps to avoid these potential problems: n Involving experienced consultants to help ensure that there are no oversights in the planning process.
n Teaming with solution providers rather than equipment-focused vendors; this approach will help you better and more effectively manage the interface between the various systems and platforms in terms of planning, installation, and service, which, if not adequately co-ordinated, can delay project implementation or limit the theatre’s usability.
n ‘Visualising’ the hybrid OR using 3D tools with VR technology, to facilitate discussions among stakeholders, while helping to identify potential problems that would otherwise not be readily apparent to the planning team.
From design to implementation The duration of any hybrid OR project strongly suggests the need to have continuity of involvement by the stakeholders who participated and were most closely involved in making the planning decisions. At this point in the process, successful installation relies on confirming the room configuration, equipment specifications, and exact placement of all the hybrid OR technology. Detailed 3D visualisation, DWG, and BIM drawings should be completed for the new hybrid OR, crosschecked, and approved by each equipment supplier, to help avoid unanticipated installation issues. In traditional ‘stick-built’
construction, last-minute alterations can result in expensive changes and unacceptable delays. For this reason, many hospitals have chosen modular stainless steel wall panels that facilitate any required modifications without
Planners need to ensure that the hybrid OR quickly adapts to the needs and preferences of each surgical discipline.
Getinge recommends selecting a hybrid OR surgical table with interchangeable tabletops to accommodate a wide range of patient positioning, and for the comfort of the surgical team.
Detailed 3D visualisation, DWG, and BIM drawings should be completed for the new hybrid theatre, crosschecked, and approved by each equipment supplier.
OPERATING THEATRE l JULY 2018 l 39
t
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64