NIGHTINGALE HOSPITALS


Jeremy Watson said: “I joined my Eta colleagues at the Nightingale London during the first week of construction, and was tasked with leading the integration, testing, and commissioning, of critical power infrastructure. The pace of construction required a ‘hit the road running approach’, with the need to overcome challenges rapidly. The days were long and mentally draining, overcoming what retrospectively was a near vertical learning curve. Against what appeared to be insurmountable odds, we successfully commissioned 7.5 MVA of generator-supported Uninterruptible Power Supply systems to support critical clinical services in four days.”


The Project Support Team Step-by-step reporting ensured a constant stream of qualitive information between the design and construction teams, with the objective of handing over to the New Estates Management team. In the words of one key Project support manager: “I had the pleasure of working with Eta Projects during set-up and


construction of the Nightingale project. The team was fantastic from start to finish. Eugene, Kim, Rick, and the team were always on hand to provide support, expert advice, and reassurance, to any questions that came up from the senior risk officer or the team. When any issues occurred, Eta was on hand to provide solutions and understanding of how these sat within the project’s wider context. Having the team on board was a tremendous help, and we could not have done the work without them. Thank you to all those involved. It was one of the most difficult and demanding projects, but working together as a team made it all come together.”


MITIE – an emotive story Having worked in the NHS for over 20 years, I have developed maturity and a veneer of mental protection against the frontline treatment of seriously injured and / or ill patients. As the project neared completion, the MITIE team was accepting handover for its frontline support engineering workers. One was a young female engineer, Lauren Seakens, to whom I extended some advice. Asked if she had any experience of healthcare , she answered: ‘Yes and No’ – ‘Yes’ in terms of personal experience, when she and her mother carried out CPR on her father after he suffered a heart attack, and ‘No’, in that she had no other previous hospital experience. Thankfully, her father had survived – thanks to the CPR and the follow-up up treatment provided by the NHS.


Eta Projects director, Kim Shelley, taking time out with Testing and commissioning engineer, Alex Denes.


Following some collaborative working with the Eta Commissioning team, where she picked up knowledge of the electrical distribution to the medical floor, 24 hours


Ultra Clean Air, Anywhere Small, modular, air handling unit


• Client specified • Ultra Clean (UCV) • Postive pressure • Negative pressure • User/BMS control


• Fixed or Mobile • ULPA15 or HEPA14 • EN14644 Part 3 • Low cost • Low running cost


Web: www.airsentry.co.uk


• Rental available • British product • Easily deployed


• Increased hourly air changes between AGP


Tel: 01666 818087 August 2020 Health Estate Journal 55


Pictured (left to right) are: Rick Seymour (Eta), Andy Vernon (Hoare Lea), Graham Stone (Hoare Lea), and Eugene Conroy.


later she was gowning up to join the frontline medical staff on the floor, and providing engineering support services. She said: “Not knowing what I was going to walk into each day going onto the clinical floor had a big impact on me.”


Hoare Lea – commissioning and validation


As with all testing and commissioning, witnessing and documentation were key to the delivery and handover of the project to the incoming Estates team. This element involved many hours, late into the night, for the testing and commissioning team, which included the Hoare Lea Commissioning and Validation team under the lead of Andy Vernon, who says: “Hoare Lea was brought on board to witness the mechanical and electrical designs independently, and to take charge of commissioning the installation. Having the first 500 beds commissioned, signed off, and ready for a potential 500 patients, was as fast a programme of works as we are likely to work on. To keep pace with the installation teams, Graham Stone of Hoare Lea Property Services


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72