ELECTRICAL ENGINEERING
had to be moved temporarily; thus in total there were 110 safety programmes developed. It was a massive project.” Andy Fairless explained that the Trust’s Jake Marshall undertook the majority of the more straightforward cable isolations, while he carried out more complex isolations.
Some panel replacements took four hours
He said: “Taking one cable off the ‘old’ switchboard and connecting it to the new one could take anything up to four hours. In some cases, we had to move cabling from the old switchboard to a new one, and from there, subsequently, to another one. The switchboard replacement was so complex for a number of reasons – including all the co-ordination, and the fact that the existing unit hadn’t been comprehensively serviced for a while. Some of the cables were so large that you couldn’t move them until you got the switchboard out of the way. We effectively had to pull the cables out, and join them in a box, to allow us to remove the old switchboard. This alone was challenging.”
The existing switchboard was replaced with three modular units. Andy Fairless said of the limited access to the switchroom: “There is walk-in access, but with courtyards around the surrounding
buildings, you couldn’t, for instance, get a Hiab to unload or offload, which meant a lot of hand manoeuvring equipment down corridors.” Underneath the old switchboard was an access ‘pit’, some 1,200 mm deep, containing extensive overlapping cabling. He said: “It took a lot of work to identify where the cables went. Some of the core cables we had to switch had a diameter of up to 240 mm, and, due to their sheer size, are not the easiest to work on, especially within the confines of a shallow pit.” All the switchboards were ‘bottom entry’, with all the cabling underneath. He said: “There was a chequer plate on the switchroom floor
which we had to remove to afford access, but we then needed to get two or three people into the space below to get the cables to move. All the cables are live. Although they incorporate armour protection, you still have to be really careful when you are in that space; hence all the time taken to ensure we did it right and safely.”
Cable identification exercise Prior to the cable switchover starting, team members had undertaken a cable identification exercise. Andy Fairless elaborated on this: “This entailed identifying every switch on the
The new transformer installation in the Leazes Wing.
August 2020 Health Estate Journal 33
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72