PRODUCTION • PROCESSING • HANDLING


SECTION TITLE


What exactly hides behind the standard IEC 61518?


Te dielectric isolation kit is an essential


Corrosion costs the industry enormously


Why? Te task seemed to be quite easy, but so often the devil is in the details. In this case, the requirements were: ● Pressure of 6,000 psi (414 bar) ● Rating: 2,500 VDC/Resistance: 5 Meg Ohms


● Temperature: 176°F (80°C)


THE DEVELOPING PROCESS For a leak-tight sealing system up to 6,000 psi (414 bar), it had to tighten the bolts with a defined torque. Te plastic also had to absorb the forces resulting from this torque. Additionally, the sleeves become very soft when heated to a temperature of 176°F (80°C) and tend to creep. Tis creeping causes the bolt tension and thus the compression of the seal ring to decrease. At this point, leakage can occur. To achieve the goal, the team conducted detailed investigations of the gasket geometry, extensive testing of the composition of different plastic materials. It even tested different contents of glass fibre for its reinforced plastics.


part of the company’s Direct Mount System, as it enables close coupling of electronic flow measurement devices to an orifice fitting. AS-Schneider designed these systems for close coupling in a safe, efficient manner. Tey cut or reduce the effects of gauge line error. Te Pipeline Gas Compressor Research Council and Southwest Research ran a recent study. It looked at pulsation created by regulators and flow control valves. Te team also researched compressors and some piping configurations. Tey found that pulsation may create undesirable levels of square root error. It also creates gauge line error. Pulsation at the orifice meter is a significant source of lost natural gas. Tese errors cause huge economic gains or losses. Tey affect both the buyer and seller in a natural gas pipeline system. Te research made some conclusions about transmitters and electronic flow measurement devices. It found they should use equal length, large orifice constant diameter gauge lines. Tey should also use multi-turn valves to protect electronics


from pressure spikes. Tese should be close coupled to the orifice taps. Te AS- Schneider system minimises or eliminates gauge line error, and it’s easy to install. Also, it’s available in both vertical and horizontal to vertical configurations.


LEAK-FREE MEASUREMENT INSTALLATION AS-Schneider has developed the so-called Schneider DirectMount System – SDMS for short. By using the SDMS, operators reduce the installation costs significantly. Tere’s no need to manufacture and install tube runs, fittings, and expensive pipe stands. Te SDMS reduces potential leak points associated with NPT connection. Te solution also provides a safe, compact, leak-free measurement installation. Te internal porting promotes self-draining of condensates and liquids to reduce freezing issues. It uses the IEC 61518 system, which meets the recommendations of the American Petroleum Institute. Te Gas Processors Association and the American Gas Association have also approved it.


Dielectric isolation kit used in many installations


www.engineerlive.com 33


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60