search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PROJECT REPORT: CULTURAL, CIVIC & FAITH BUILDINGS


47


© Stéphane Aboudaram | WE ARE CONTENT(S)


for it. When this is not possible – due to changes in weather or restraints introduced by precious art pieces – the team designed a controlled environment for the works on show. This is serviced by a dedicated air system from a small plant room, which feeds air through at a low level, to then be extracted at high level.


Covid triumphs & tribulations Despite the building now being completed, at the time of this interview the design team had been unable to see the finished result, with Spence only able to make it onto the building site once during the entire process because of Covid restrictions. Also sadly due to Covid, there would be no chance of an opening event either for the design team. Where once not visiting the site might have been a significant barrier, however, the in-depth modelling of the project beforehand by the specialist engineer, Hasson Engineering Solutions (who produced the 3D Tekla model), and what Spence calls the “diligence of the Bysteel fabrication and construction teams” enabled the project to be


ADF JULY 2021


completed smoothly and “under careful watch” throughout.


“The modelling was a very good device for us to be able to control exactly both the production and construction onsite without the usual visits,” explains Spence. “We were getting updated photographs throughout, but there were very few surprises due to the level of thought and refinement that had gone into this model.”


“This worked heavily to our advantage in terms of Covid and the lockdown circumstances since,” he adds. “And this success is shown in the outcome – since completion, the response has been really positive, so the whole team are proud of what we have been able to produce.” While lamenting his inability to see the completed building, Spence is eagerly looking forward to a future visit: “I’m most excited to see the gallery when it is further ‘bedded’ into the landscape,” he concludes. “With social media, it’s also fascinating to see other people’s take on a project, and there’s always something in the views of others that makes you see a building in a new light.” 


PROJECT FACTFILE


Architect: Rogers Stirk Harbour + Partners Local architect: Demaria Architecture Client: Château La Coste/Paddy McKillen


Structural engineer: Lang Engineering Consultancy Project manager: Rainey + Best Steel Works: Bysteel Building enclosure: Setanta Construction


Specialist engineering: Hasson Engineering Solutions Local engineer: ATES Internal fit out: SCEA Château La Coste, IDME France & ACM France Completion date: November 2020 Gross internal floor area: 120 m2


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84