search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
82 LANDSCAPING & EXTERNAL WORKS


Green-tech supply materials as part of £300m Leeds redevelopment project


with the West Yorkshire Playhouse, the Quarry Hill Campus is one of the first developments to be completed as part of an exciting £300m redevelopment of the area. As part of the larger development, including Gateway Court and Playhouse Square, approximately 0.4ha of existing green space will be enhanced, and a further 0.2ha created, including 33 new trees, shrub planting and grassed terraces. Situated next to the west Yorkshire


D


Playhouse, planners were keen to develop a continuous public realm throughout the site. Leading Leeds landscape architects Re-form, used landscaping and planting to soften what was previously a hard-urban space. The use of trees along the front of the building, as well as around the entrance and raised parking area, add welcome greenery, while three large planters break up what would be an


esigned to be an important and integral part of Leeds’ vibrant Cultural Quarter, sitting side by side


exposed area at the lower level front corner. The Green-tech team worked with Howard Civil Engineering, providing the unique, patented ArborRaft tree pit system. ArborRaft’s shallow profile not only protects the soil from compaction, but also reduces intrusion into the rooting area. Combined with Green-tree’s specially formulated AborRaft soil and subsoil, this will give the trees the very best chance of successful establishment. Terram Root Guard was used


BRUNDLE F.H.BRUNDLE SERVING THE TRADE SINCE 1889 SQUARE & ROUND POST SYSTEM


ALUMINIUM HANDRAILING SPECIALISTS


• Long lasting • Lightweight & easy to handle SIMPLICITY SYSTEM


• Ready to install pre-assembled posts • Panels can be cut to size on-site • Just cut, glue & screw


HORIZON SYSTEM


where necessary and the tree pits were finished off with the Fortress grille, allowing paving to be laid seamlessly, practically up to the trees themselves. Irrigation is provided by the tried and tested Mona Relief Grande. The perforated pipe sits around the root ball and, via a capped filler pipe provides a cost effective, easy to use irrigation solution.


01423 332100 www.green-tech.co.uk


For more information 01708 25 35 06


sales@brundle.com www.fhbrundle.co.uk


CONTEMPORARY SYSTEM


LIGHT


STYLE


VISION


WWW.ARCHITECTSDATAFILE.CO.UK


ADF JANUARY 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84