search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
SUBSEA EQUIPMENT/UNDERWATER INSPECTION TechnipFMC Inks Multi-Million Deal


with Woodside Down Under Subsea firm TechnipFMC has announced a multi-million deal with Woodside at its Pyxis and Xena fields, located offshore North West Australia.


The London-headquartered firm has been awarded an integrated engineering, procurement, construction and installation (EPCI) contract worth between £60 to £200 million.


TechnipFMC will design, manufacture, deliver and install subsea equipment including subsea production system, flexible flowlines and umbilicals.


This contract is the first announced under a five-year EPCI frame agreement between TechnipFMC and Woodside.


The firm said it allows the development of projects for Woodside through


“early engagement” and “utilization of TechnipFMC integrated execution solutions.”


Arnaud Pieton, President of Subsea at TechnipFMC, said: “We are very pleased to have signed a five-year Frame Agreement with Woodside that leads to this first contract under this agreement.


“This EPCI contract combines our integrated subsea solution with our Subsea 2.0 products and illustrates TechnipFMC’s complete offering.


“We value our long-term, collaborative relationship with Woodside and are committed to bring the best in the execution of this project.”


Woodside announced yesterday that it will move ahead with its Scarborough plan in Australia, despite the final


investment decision on its Browse project pushed back to 2021.


In August, TechnipFMC’s board unanimously voted on to separate the group into a technology and service company, RemainCo, and an engineering and construction firm, SpinCo.


TechnipFMC employs more than 37,000 people globally. RemainCo will account for 22,000 of these workers, while SpinCo will have 15,000.


The restructuring is expected to complete during the first half of 2020.


Trendsetter Wins Subsea Connection Systems


Order from Talos Specialised subsea solutions provider Trendsetter Engineering has secured a contract to provide TC7 Clamp Connection Systems to oil and gas firm Talos Energy.


Talos Energy plans to use Trendsetter’s TC7 clamp connectors and other ancillary equipment on the Bulleit development, which is located in the Gulf of Mexico’s Green Canyon 21 block. Trendsetter will deliver the equipment to Talos next year.


Trendsetter Engineering Executive Vice-President David Older said: “Building upon past successes, we are thrilled to continue to provide Talos Energy with our line of TC7 subsea connectors.


“The Bulleit order builds on a successful relationship that focuses on delivering a quality solution to support Talos’s Gulf of Mexico project portfolio.”


The family of subsea Trendsetter Connection System (TCS) has been developed to meet the oil and gas industry’s needs for reliable connector products. Trendsetter’s TEX metal-to-metal (MTM) gasket system is the crucial


component of the TCS. The subsea connector and TEX gasket technology were introduced by the company to the industry in 2015.


Until now, Trendsetter has delivered more than 250 connectors to clients globally. Trendsetter said in a statement, the product line spans between 2in and 16in in nominal bore sizes, as well as multi-bore, 400°F and 20,000psi internal pressure.


Based in the US, the company provides specialised subsea hardware and offshore service solutions at a global level, right from exploration drilling through abandonment.


November 2019 www.sosmagazine.biz 35


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52