90 LANDSCAPING & EXTERNAL WORKS


Hauraton drainage systems installed at Plant T


he Margam Green Energy Biomass Plant is a 40MW electricity power station utilising chipped wood waste as


fuel otherwise destined for landfill. When fully operational the project will use around 300,000 tonnes of waste wood from nearby regions. The plant is located on land off Harbour Way (A4241), near Margam in South Wales, in an area designated for commercial and industrial development. Built on a 3.98 hectares site the buildings are surrounded by a 6209m2


(66,834ft2 ) concreted yard plus asphalt


access roads and car park. Hauraton supplied three types of channel


to meet the rigorous specifications for surface drainage of the main concreted yard surrounding the plant, weighbridges and car park. Three sizes of RECYFIX®


HICAP® 2000 and 255 metre of HICAP®


specification is highly resistant to extreme loads and constant dynamic forces and was found to be ideal for the weighbridge application. The FASERFIX® SIDE-LOCK®


gratings are secured by patented boltless system. The


system allows gratings to be installed and later, removed quickly. Once a grating is positioned over the channel, foot pressure is simply applied. A loud click is then heard which confirms it is securely locked onto the channel. The grating is removed using a large screwdriver inserted into a discreet leverage point. This feature is particularly useful where channels need to be cleaned out at regularly. Finally, 39 metres of RECYFIX®


PRO 100 high


capacity channels were installed in the yard. 3 metres of HICAP® HICAP®


The total water capacity of the HICAP® channels was just over 20,390 litres. By installing this system, the channel runs were kept to a minimum so saving on installation


1000, 303 metres of 3000.


costs and future maintenance. 42 metres of FASERFIX®


Type 75mm factory fitted with FIBRETEC® heel-safe gratings were installed in the car park. The FIBRETEC®


grating, moulded from a fibre SUPER 150


channels with Class F900 ductile iron 20mm gratings were installed around the two weighbridges. The FASERFIX®


channel


component is made from the company’s Fibre Reinforced Concrete with galvanised steel angle housings moulded into the top edges of the channel during production. This


strengthened Polyamide (PA-GF) and allows loadings up to Class C250 (BSEN 1433) All the RECYFIX®


channel components


specified for the project are made from 100 per cent recycled Polypropylene (PP) derived from post consumer and post industrial sources.


01582 501380 www.hauraton.com


WWW.ARCHITECTSDATAFILE.CO.UK


ADF APRIL 2019


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92