Rope and Sling modifies lifting beam for Tata Steel


capacity beam to Tata Steel UK Ltd.’s Continuous Casting Plant in Port Talbot, South Wales, having completed modifications and subsequent testing. Tata’s Port Talbot and Llanwern sites are part of the Tata Steel Strip Products UK Business, which makes hot-rolled, cold-rolled, and metallic- coated strip steels. The integrated steelmaking sites use imported ore and coal to produce up to 3.5 million tonnes of hot rolled and cold rolled annealed in steel coils per annum, for a variety of different end uses.


L


RSS accepted a scope of work to add four new lifting points (two on either side) and proof load test the 100t capacity, 8,260mm-long lifting beam that would be used during an upcoming shutdown. The beam, which was originally 250t capacity and had a tare weight of 9t, was returned with four 35t capacity wire rope slings and four 35t capacity shackles for the top, in addition to a pair of 60t grommets for the bottom.


Upon completion of the modifications, a 450t capacity


ifting and rigging


equipment supplier Rope and Sling Specialists Ltd. (RSS) has returned a 100t


Tata Steel required modifications of the beam prior to shutdown work at the Continuous Casting Plant in Port Talbot, South Wales.


mobile crane and ancillary equipment were used at rental firm Cramscene Ltd.’s Leeds facility to test the beam to 113.6t, which was safe working load (SWL) multiplied by 1.04 with an addition of 9.6t, to comply with relevant standardisation. Finite element analysis (FEA) and magnetic particle inspection (MPI) followed. MPI is a non-destructive testing (NDT) process for detecting surface and shallow subsurface discontinuities in ferromagnetic materials, as Gary Coleman, site engineer at RSS, who was involved with successful execution of the project, explained. Steve Hutin, managing director at RSS, said: “This project reiterates the importance of using specialists for any matter involved with lifting


and rigging gear. The level of engineering and subsequent testing required even for a relatively straightforward modification could only have been delivered by engineers who deal with below-the- hook and other lifting equipment first and foremost, not as an additional service on the periphery of a broader operation.”


He added: “Overhead lifting and rigging equipment, such as lifting beams, is key to productivity in any steel sector environment, where critical lifts are commonplace. Broader industry should look to the best practices of pioneers in the market, like Tata Steel, and replicate safety procedures, protocols, and supply chain strategy, at the core of which is


A 450t capacity mobile crane was used at rental firm Cramscene’s Leeds facility to test the beam to 113.6t.


a commitment to working with specialists in each field of expertise that relates to their work.” South Wales has a proud heritage in steel, dating back more than a hundred years. In addition to Port Talbot and Llanwern facilities the region is also home to Trostre and Orb sites. The steel made by Tata in South Wales makes its way into an array of end products, from cars to construction machinery, from the Millennium Stadium to filing cabinets and fridges.


Contact for editorial enquiries: Steve Hutin, steve@rssgroup.co.uk


The project required extensive planning that could only have been completed by a specialist lifting equipment company.


RSS accepted a scope of work to add four new lifting points to the beam.


www.internationalmetaltube.com IMT December 2018 17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36