search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Appointments & News


Stylish casing solutions from Encasement T


he extensive refurbishment and upgrading of Wolverhampton’s Mander Centre shopping mall has


included both Vecta wall lining systems and ‘Forma’ column casing solutions from Encasement as part of the £35 million project. A key part of the plans was to improve the


shopper experience at the Mander centre by creating a double height full length glass atrium, which incorporates both ground floor and gallery shopping areas linked by a footbridge with escalator access. The comprehensive revamp has also


attracted a number of major retailers to the centre with H&M being one of the first to move into the new complex, while Debenhams is one of the latest with its 90,000 sq.ft department store. To help create the high quality finish demanded by the centre’s owners, Encasement’s Vecta interior wall lining system was used to clad the atrium and mall footbridge, as well as the gallery ring beam bulkhead. All of the panels were manufactured and


installed by Encasement and are finished in white to integrate with the interior design scheme which helps create the bright, open space for retailers and shoppers. In addition to the Vecta system, Encasement also manufactured, supplied and installed 34 Forma bespoke column casings, which use an elliptical contour design and are located around the perimeter of the ground floor and gallery shopping area to conceal structural steelwork.


Each column casings stands 3000mm high,


but the profile dimensions vary depending on the size of the structural steelwork that needs to be concealed. All casings are manufactured using Alucobond®


aluminium composite to


provide a durable and tough surface for high traffic areas and is finished in silver grey to integrate with the colour scheme.


01733 266 889 www.encasement.co.uk


Bauder achieves prominent Investors in People Platinum accreditation


the National scheme, within the Construction of Buildings category. The Platinum accreditation is the highest accolade that can be achieved and is currently held by only 1 per cent of IIP accredited organisations. There are currently just 78 organisations accredited Nationally and only 23 of these are located in the South of England (figures at September 2018). The accolade clearly demonstrates Bauder’s


B


commitment to its strong Culture and inherent staff wellbeing, personal development and embedded leadership practices. Andrew Mackenzie, Managing Director,


said about the award: “This is a remarkable achievement for everybody in our Company, we are truly delighted. We never forget that our continued success is reliant on our brilliant staff and I am so proud of the team here and everything they do. It is only right that the


auder has become the first to achieve the Investors in People (‘IIP’) Platinum standard, the most sought after status in


Company strives to provide the best possible culture and working environment for all employees and the Investors in People accreditation is a great way of seeing how we are doing and where we should focus to make Bauder an even better place to work.” Family-owned company Bauder, supply


flat roof and green roof systems within the construction industry, with a workforce of over 160 employees located throughout the UK and Ireland. Bauder had been awarded Gold IIP standard in the two previous assessments and has gained the top accolades since 2012. IIP was launched in 1991 to raise


the performance of UK businesses relative to international competitors. The Investors in People framework defines what it takes to lead, support and manage people well for sustainable results. In September 2015, Investors in People launched the Sixth Generation Standard, to reflect the latest of workplace trends and robust practices


required to create outperforming teams. The Investors in People Framework is a


four stage performance model with nine performance indicators which enable measure- ment and benchmarking across key business areas such as; Leadingand inspiring people, Living the organisation’s values and behaviours, Empowering and involving people, Managing performance, Recognising and rewarding high performance, Structuring work, Building capability, Delivering continuous improvement and Creating sustainable success.


01473 257671 www.bauder.co.uk


6 www.buildingconstructiondesign.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26