search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
FEATURE SPONSOR


SPECIALIST COATINGS MACRO PROJECTS FAIL BY


MICRO PROBLEMS Best defence against premature corrosion: paint inspection


European countries commit themselves to a low CO2


emission energy, which


leads to a release of large projects in the wave & tidal energy industry. The engineering part of all projects is under full control with highly experienced engineers and project managers in charge. However, there is not enough attention paid to special coatings and paint inspection itself, which can cause problems and money in the future.


INVISIBLE MISTAKE WILL CAUSE A PROBLEM IN THE FUTURE Some mistakes during the coating process are not visible to the naked eye. These mistakes will develop problems over time. It may take two or more years before it becomes visible, but by that time the projects are already up and running and the price for repair is more


than five times higher than the initial job and fixing projects offshore leads to further complications. The quality of an offshore coating application is much lower than the original job.


PINHOLE CAUSES CORROSION For instance, on many occasions, the problem starts with a pinhole of fewer than 100 microns (µ) in diameter. If these are not observed during the initial application of the coating they will develop in a pin corrosion at a later stage. Even though the hole is so small, the sea water will find its way to the surface and the corrosion will spread from there.


SURFACE PREPARATION IS KEY Another mistake often made is the wrong surface cleaning. Dust particles


on the surface will have a high influence on the flexibility of the coating and will contribute to osmosis effect and micro cracking which will in the end cause blistering. Again, on numerous occasions, it cannot be observed by the naked eye. Professionals will detect this problem at an early stage.


MINIMISING THE COST The revenue of a project highly depends on the cost that needs to be made during operating. Selecting highly skilled and experienced Paint Inspector for the initial coating application is crucial to decrease the maintenance cost in the future.


Paint Inspector


www.wavetidalenergynetwork.co.uk


35


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39