SPOTLIGHT ON THE BASQUE COUNTRY FEATURE SPONSOR


NEW SUBSEA CONNECTION SOLUTION


BiMEP (Biscay Marine Energy Platform) provides research, testing and demonstration facilities for developers working in the field of ocean and floating offshore wind energy


Sometimes this challenge has been addressed by acquiring electrical connectors from other sectors that are oversized and expensive. The presented solution is named KONEKTA2 and it has been developed by Ditrel Industrial with the objective of simplifying the connection/disconnection operations and reducing costs and time by avoiding the use of expensive marine equipment.


DESCRIPTION


The solution consists of a male/female connection, performed on the surface from inside the energy converter. This means that there is no need for using large vessels, cranes or ROVs. On the one hand the male body can stand by floating and is linked permanently to the subsea umbilical cable ready for the connection to the converter. On


Location of male and female bodies


the other, the female body is welded to the hull of the converter. Once the converter is towed from the seaport to the generation location, the connection can be performed using a normal sized vessel.


MAIN FEATURES


» Up to 20kV (nominal voltage), 66kV under development


» Triphasic connector for medium voltage, fibre optics and auxiliary


supply


» Low manufacturing and positional costs


» Tested and validated in BiMEP » AIP Certificate from Bureau Veritas


» Protected with patent EP 2 784 364 B1


PROJECT MILESTONES


» April 2014 – KONEKTA2 project begins


» August 2015 – participation in ‘RECODE’ consortium project


» March 2016 – participation in the ‘HARSH’ consortium project for


» September 2016 – real sized prototype is manufactured


» December 2016 – onshore performance testing


» March to November 2017 – survival testing in BiMEP


Ditrel Industrial 16 www.wavetidalenergynetwork.co.uk


selected by the OCEANERA-NET Joint Call Committee


designing, manufacturing and validating different components for the Offshore Energy Sector


Extraction after seven months submerged


Survival testing at BiMEP


» June 2017 – KONEKTA2 obtains AIP certificate from Bureau Veritas


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39