search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
SITE PREPARATION BUILDING FABRIC & EXTERIORS QUESTIONS TO ASK


Before selecting your sewage treatment plant, here are some important questions to ask your supplier:


Does the proposed site meet Building Regulations? Will the discharge meet environmental regulations? What size plant do I need for my property? Am I in an exclusion zone? Does the plant conform to the EN12566-3 standard? Is the supplier accredited by British Water? Can my installer manage the whole process? What will the upfront costs and running costs be?


and potentially cause issues when the property comes to be sold. While it is possible for self-builders to install their own package treatment plants, WPL only works with a network of independent experts to ensure that their plants are always fully compliant. Drawing on decades of experience gives homeowners peace of mind and provides access to an end-to-end service from plant selection, through installation, to maintenance and desludging. Installing the plant is often the easiest part of the process. Meeting environmental and Building Regulations can require more specialist expertise so that problems do not emerge down the road.


An experienced independent expert can also help clients calculate whole life- cycle running costs for their treatment plant, including energy consumption, maintenance and desludging intervals. Households can reduce their environmental impact and relax in the knowledge that the risk of fines for unintended breaches of the new rules has been eliminated.


EASY TO INSTALL


It is no surprise that investment in quality wastewater treatment can improve the resale value of a house. Find a product that meets the current British and European Standard for small sewage treatment plants and is fully compliant


with Environment Agency regulations. Top-grade equipment will comfortably exceed most discharge consent standards, though where sites have more stringent ammonia consent standards, an expert installer can advise on additional processing requirements.


The latest single-tank wastewater treatment systems are easy to install and boast up to three-year intervals before desludging. This compares favourably with septic tanks, which often require annual emptying. The lower maintenance requirement is much more compatible with the busy lives and high expectations of today’s homeowners.


Andrew Baird is technical director at WPL


Replacement aluminium windows for period and new homes


The Conservation Range


 Single or dual RAL colours  Fit into timber or direct to stone


  UK manufactured


For expert advice call 08008 401 508 www.thwc.co.uk


Showrooms at: Sevenoaks Dorking Beaconsfield Loughton


january/february 2018


www.sbhonline.co.uk


31


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60